SBIR/STTR Research Award

Rock Melt Borehole Sealing System

Award identifier 78b4c5467724b11da044b18a78eccafc23cac0da53ef0d294d67729a830c46e4Awarding agency Department of Energy

Award amount

$999,790

Program and phase

SBIR · Phase II

Award year

2015

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Re/Spec Inc.
Proposal award date
2015-07-27
Contract end date
2017-07-26
UEI
D8UANMMVQDJ8
Solicitation number
DE-FOA-0001258
Topic code
21a

Research abstract

Deep geological disposal is a promising and widely accepted method for long-term disposal of nuclear waste, and the option of deep borehole disposal is considered an inherently safe method. The feasibility of the deep borehole option relies upon designing and constructing an effective seal within the borehole that ensures the waste package does not communicate through the borehole itself with the shallow subsurface and biosphere for thousands of years. Recent work has suggested that encapsulating the waste in melted rock will create a seal that is more reliable and lasts longer than conventional sealing materials, such as cement and bentonite. The proposed project consists of designing a remote, electrical rock melt borehole sealing system and testing the performance of the system both in a laboratory and then with field tests in an underground environment (the Sanford Underground Research Facility [SURF]), which is located at the former Homestake Gold Mine in western South Dakota). Phase I of the project evaluated the overall feasibility of the rock melt sealing concept by incorporating laboratory testing and numerical modeling to develop a preliminary design of a downhole heater. Phase I also estimated costs for in situ field testing at the SURF and indicated that the necessary field evaluation could be completed within a reasonable budget. The major tasks envisaged for the Phase II Work Plan consist of the following: 1. Design and construct the initial prototype heater 2. Perform laboratory-scale prototype testing 3. Prepare the SURF field experiment site 4. Perform field-scale rock melt testing within the SURF 5. Conduct a mine-back investigation to access the borehole seal 6. Design a full-scale heater for use in the deep borehole environment. In situ melting experiments performed at the SURF provide a unique opportunity to evaluate the rock melt seal system in a deep underground environment and perform a mine- back excavation and forensic analysis, which is necessary to build confidence in the system. The demonstration of a successful design rock melt borehole sealing system has the potential to significantly contribute to the U.S. Department of Energy Used Fuel Disposition Campaign and help address an issue of national (and international) importance. Confidence in a more robust sealing method is expected to be advantageous for the consent-based approach to siting waste facilities.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

8 SBIR/STTR records share this UEI (1986–2019). Reported award amounts total $1,771,363. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, National Science Foundation, Department of Transportation, Department of Defense

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.