SBIR/STTR Research Award

Active S-Band Pulse Compressor

Award identifier 60763bb74370ce22456cbe290545a6a215b9d95a2c023fb693452a9e718085ddAwarding agency Department of Energy

Award amount

$149,967

Program and phase

SBIR · Phase I

Award year

2015

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID BEAMLABS LLC
Proposal award date
2015-06-08
Contract end date
2016-03-07
UEI
UUP7AMSJBLL2
Solicitation number
DE-FOA-0001227
Topic code
27a

Research abstract

Pulse compression is a method of increasing the peak power of the microwave pulse at the expense of its length. Pulse compression had been first realized at SLAC, resulting in doubling the energy of the electron beam, hence the name SLED, SLAC energy doubler. Over the years a number of pulse compressors had been demonstrated with some being bulky but efficient, like the binary pulse compressor and other being compact but less efficient, like SLED-II. An active pulse compressor had been proposed to increase the efficiency and compression ratio which relies on a high power active switch. Currently there are no practical switches that can work reliably with 100s of megawatts of power. Most of the switches ferroelectric, plasma-based, semiconductor) are limited by the breakdown strength of various dielectric inserts. An all-metal switch based on relativistic beam has proved to be one of the most successful one. However, this configuration does not seem to be practical for user facility operation. Euclid Beamlabs LLC proposes an active switch that is based on a pure copper resonator and controlled by a single-side multipactor discharge at a metallic wall in the presence of a resonant DC magnetic field and a normal to metal rf field. The discharge is ignited by external rf power produced by inexpensive 2.45 GHz, 1-5 kW magnetrons. In Phase I we will finalize a switch design and manufacture it. We will test the switch operation in the lab. Key characteristics to be demonstrated are the fast time response ~15 ns) and multipactor ignition repeatability. The two-mile accelerator at SLAC utilizes about 200 pulse compressors which are running with about 60% efficiency. Increasing the efficiency to 70% will result in a large energy cost saving. For industrial applications it is even more important to maintain a high efficiency system, because industrial radiography machines often compete with radionuclide gamma irradiators. The end user comparing the electricity bill associated with the accelerator - based system to the cost of securing, servicing and disposing of the radioactive element will find the economics of the pulse compressor accelerator-based source to be extremely favorable. The active pulse compressor will find applications in compact high gradient accelerators.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

38 SBIR/STTR records share this UEI (2015–2025). Reported award amounts total $17,194,412. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Health and Human Services, Department of Homeland Security, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.