SBIR/STTR Research Award

Efficient shaping or reshaping of complex 3D parts using engineered residual stress

Award identifier 3aa8826db54bf4ffd1a8774ae20725a11361fe938ce68cdc03544c5d35b3f50aAwarding agency Department of Defense · Air Force

Award amount

$149,942

Program and phase

SBIR · Phase I

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
HILL ENGINEERING LLC
Proposal award date
2014-07-01
Contract end date
2015-03-20
UEI
CLEZQNYDCHK5
Solicitation number
2014.1
Topic code
AF141-170

Research abstract

ABSTRACT: Due to their excellent strength-to-weight characteristics, integral components (i.e., thin-walled components machined from a single piece of material, which typically consist of a series of pockets, ribs, and stiffeners, have become commonplace on modern aircraft structure. The fabrication of integral components is a machining-intensive process that employs non-conventional machining at high material removal rates. One of the biggest limitations of high speed milling of integral structures is distortion, which results from changes in the residual stress state within the machined component. Excessive distortion can lead to the introduction of excessive fit-up stresses during assembly, can result in improper joints/connections, and can result in parts being scrapped. In certain instances, shops are allowed to use mechanical means (e.g., plastic bending over a fixture) to rectify some of the distortion. This can be effective, but is limited to use on simple geometry and this approach is lacking in quality and traceability. The proposed work plan will develop improved technology for correcting distortion (i.e., reshaping back within drawing tolerance) in complex aerospace parts. BENEFIT: The proposed shape correction technology would provide significant improvements to the efficiency of high speed machining processes. Currently, significant losses result from machined parts that are scrapped due to excessive distortion. Generally, significant machining has been performed on these parts prior to scrapping so the scrapped parts have considerable value. A process to efficiently and effectively correct the shape of these distorted parts and return them into the production supply offers the potential for significant cost savings relative to the current approach (scrapping these distorted parts). This technology is important to the aerospace community and is applicable to many other industries as well. For example, ships and space vehicles use similar integral components that have distortion related issues. Large welded structures like pressure vessels and industrial facilities are often adversely affected by distortion due to residual stresses from welding. As this technology becomes more mature there is an opportunity to apply it for benefit in other industries.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

25 SBIR/STTR records share this UEI (2005–2025). Reported award amounts total $14,489,823. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.