SBIR/STTR Research Award

Triaxial Accelerometer with Low Offset and Noise (TALON)

Award identifier 13055b8efda8f846674e4a246bc9b547b257aff9499a3fe54d6409967f5f4393Awarding agency Department of Defense · Air Force

Award amount

$149,992

Program and phase

SBIR · Phase I

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
Archangel Systems, Inc.
Proposal award date
2014-06-01
Contract end date
2015-03-01
UEI
F45JC92655L6
Solicitation number
2014.1
Topic code
AF141-135

Research abstract

Archangel Systems, Inc. proposes a feasibility study coined Triaxial Accelerometer with Low Offset and Noise (TALON) to meet the accelerometer needs for DoD"s next-generation IMUs in agile missile programs. DoD targets for IMU size, weight and power (SWAP) budgets are aggressive. To meet these requirements, TALON leverages prior Archangel work for DARPA"s NGIMG project. Specifically, the MEMS and support electronics from that project are the baseline TALON system. In TALON, Archangel will implement a novel noise reduction strategy we have coined Quadrature Phase Locking (QPL). QPL is a feedback loop that will isolate and eliminate the majority of electrically-generated noise in the current hardware. Based on experiments to date, a 10X enhancement is anticipated. With respect to the NGMARS baseline, QPL requires a new digital controller (implemented in the incumbent FPGA) and a slight hardware modification. In addition to noise reduction, QPL will also eliminate the most egregious thermal sensitivity issues. This will greatly simplify the thermal calibration procedures in production and harden TALON against the high thermal rates seen in missile launches. Technology transition and supply strategies are also examined. A roster of candidate MEMS foundries exists with down-select in Phase 2. The final electronics will be COTS to avoid the costs and delays associated with ASIC design cycles. A COTS approach also aligns with standard contract manufacturer approaches for PCB production, test and Bill of Material management.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

14 SBIR/STTR records share this UEI (2002–2014). Reported award amounts total $2,578,242. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Transportation, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.