SBIR/STTR Research Award

Low Cost Method of Manufacturing Space Optics

Award identifier 4b27e6d894afc38475cba0da4b7a2ebfaa12d77e02f65999812f3de9e9256d32Awarding agency National Aeronautics and Space Administration

Award amount

$749,569

Program and phase

SBIR · Phase II

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
ORMOND, LLC
Proposal award date
2014-04-24
Contract end date
2016-04-23
UEI
JXYZNSPKJJL7
Solicitation number
Not reported
Topic code
S2.04

Research abstract

The Phase I project successfully demonstrated the feasibility of developing a technology that will reduce cost and manufacturing time, broaden design options, and improve performance of large space optics. Primarily addressed is light weighting ULE glass mirrors for large telescope systems. While milling and cutting materials such as ULE or SiC is often performed at Ormond using a novel abrasivejet technology, there is a need to develop this technology to a the requirements of large optics manufacturing. In Phase I, Ormond proprietary glass and ceramic cutting and milling technologies were adapted to AMTD-2 requirements through software, process and tool development. The technology is now at TRL5 and technology feasibility has been demonstrated. A demonstration coupon was machined based on the current AMTD mirror concept at rates several times faster than conventional grinding can accomplish. This design has 0.75 inch deep hex cell pockets in the mirror back, the same as would exist on a full scale mirror. Rough semi-elliptical optical surface machining was also demonstrated in Schott glass. Tooling designed in the Phase II program will support substantial improvements in risk mitigation, tolerance holding capability and material removal rates. This work will continue to be performed with close interaction with NASA and Exelis to insure that the work directly supports current and future program needs. The Phase II program will result in a working system that is capable of completing a 1/3 scale model of the AMTD-2 mirror with tremendous cost savings, schedule reduction and risk reduction compared to grinding. Capacity for full scale up will be demonstrated during Phase II.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

39 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $13,773,357. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.