SBIR/STTR Research Award

Power-Dense Lightweight Hydro Turbine/Generators for 20,000+ Low-Head US Dams and Reclamation Conduits that Install In-Line,are Low Cost and Mass Producible

Award identifier 909c638e8d058929b3294529dc4af8beafca6b8d10000dff61a8239b8738ed4cAwarding agency Department of Energy

Award amount

$1,000,000

Program and phase

SBIR · Phase II

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Amjet Turbine Systems, LLC
Proposal award date
2014-04-08
Contract end date
2016-04-07
UEI
Not reported
Solicitation number
DE-FOA-0000957
Topic code
07b

Research abstract

There is a manifest need in the US and the world for renewable, lowcost energy. However, conventional and small hydropower systems for (20,000+) low head dams (550ft.) in the US tend to be extremely costintensive due to a variety of configurational issues. These include coffer dams, power houses, complex foundations, complex unit maintenance, large space requirements, and turbine technology requiring major civil engineering work. These factors have severely limited the number of economicallyviable projects in the low head power range. DOE has identified these dam locations and has challenged industry to produce a unit generating clean power at low cost to the public. The ATS turbine/generator answers this challenge as it provides the hydropower industry with a magnitude lower cost power generation system, requiring no power house, with onefifth weight and volume of a conventional system, simple maintenance and not requiring dam reconstruction. The ATS 63 Turbine/Generator is built primarily of composite materials, massproducible and ranges from 100kW to 2.5MW depending on head and flow. The low cost avoids the need for subsidy (unlike wind and solar). It will alter the hydropower outlook for the future in the US. The DOE SBIR Phase I project produced the critically peerreviewed unit design (based on an earlier test of a scale model validating the concept). Material strengthand costanalysis validated the design, and in a Phase II project, ATS will build the first unit and test it on a dam or canal. Mass production manufacture can be started on completion of the Phase II test, eventually employing an estimated 300 people in less than five years. In Phase III, ATS will install multiple units on a large US river dam, confirming a lowcost solution for power generation to all large dams including the Army Corps of Engineers lowhead dams in the US major rivers and lakes. Commercial Applications and Other Benefits: A world market of at least $83 billion, excluding China (having 49% of all hydropower) is estimated based on a preliminary market study by an independent leading consulting group. The commercialization plan provides for a pathway to economic success, made in the USA.

Technology keywords

Not reported

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.