SBIR/STTR Research Award

Embedded Sensors with Low Power Telemetry for Towed Arrays

Award identifier a432ef1cbde79afb2a430ab99bf797d9500cea7f0bafa04b8dd90553438d299dAwarding agency Department of Defense · Navy

Award amount

$400,479

Program and phase

SBIR · Phase II

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
SEALANDAIRE TECHNOLOGIES, INC.
Proposal award date
2013-12-04
Contract end date
2014-12-04
UEI
M832S92BP7S3
Solicitation number
2012.1
Topic code
N121-048

Research abstract

The U.S. Navy is interested in improving the capability and reliability of towed arrays by embedding low power telemetry electronics into the same package as the hydrophone/sensors. The telemetry electronics will be located inside a pressure housing that will contribute to increased reliability. This project requires both advancement/miniaturization of the telemetry circuits and the hydrophone to keep the overall size small (goal of 0.5"OD x 2.0"length) with the same or increased acoustic performance and lower power consumption. The smaller size allows for more hydrophones per unit length which improves array performance. Embedding telemetry with the hydrophone opens up the possibility of transmitting the response of every hydrophone to the processing system. Increased sensor count with embedded telemetry will result in higher data rates for these oversampled arrays, requiring innovative approaches to accommodate the resulting increased data bandwidth. Having multiple sensors and telemetry channels will result in inherent redundancy and graceful degradation in the event of a sensor failure. Innovative concepts will be developed to increase the number of channels per unit length in sonar arrays to improve system performance while simultaneously reducing the power required and improving reliability.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

57 SBIR/STTR records share this UEI (1998–2025). Reported award amounts total $24,234,799. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Commerce

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.