SBIR/STTR Research Award
Very High Speed Third Rail Insulator Cleaning
Award amount
$235,000Program and phase
SBIR · Phase IIAward year
2013Award details
- Awarding agency
- Department of Transportation
- Branch
- Not reported
- Recipient company
- MINI, LLC
- Proposal award date
- 2013-09-09
- Contract end date
- 2016-01-08
- UEI
- Not reported
- Solicitation number
- DTRT5707RSBIR
- Topic code
- 07FT4
Research abstract
This Phase IIB proposal will accelerate the commercialization of the Phase II project that developed the Vohrtex insulator cleaner. The Phase II cleaner used self-spinning nozzles which require oversized offset jets to provide sufficient reaction force to make the nozzle spin. The oversized jets damage the surface finish of the insulators.
This Phase IIB project will use small pneumatic, electric or hydraulic motors coupled to a new small rotary swivel, to spin the nozzles. The nozzle can be run at an appropriate speed, with smaller jets of optimized diameters, where the dwell time and diameter of the jet will wipe the dirt off without damaging the surface of the insulator.
Smaller jets will not damage the surface finish of the insulators, require less water, a smaller jetting pump and less diesel engine exhaust emissions in the tunnel confines – all required attributes that will provide the cleaner that the Subways have said they want to acquire and is vital to the commercial viability of the SBIR project results.
A prototype Vohrtex cleaner will be bench tested and also demonstrated on the track of a participating transit agency for commercialization and deployment in other subways.
Technology keywords
Not reported
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.