SBIR/STTR Research Award

Advanced Hybrid Water-Heater using ECC

Award identifier 6dfe650d1270c928825a8b056a57aa33fa8f6fe6854314f6398a3f0e5489e205Awarding agency Department of Energy

Award amount

$149,856

Program and phase

SBIR · Phase I

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Xergy Inc.
Proposal award date
2013-02-19
Contract end date
Not reported
UEI
DUNMEKHARFG9
Solicitation number
DE-FOA-0000715
Topic code
03c

Research abstract

This proposal is based on a transformational and disruptive technology of utilizing electrochemical compression to operate heat pump cycles. Xergy Inc. has exhibited a demonstration unit of its Kuel-cell device, and engaged in thermodynamic simulations utilizing water as the working fluid in order to propose the use of this Kuel-cell technology for hybrid hot water systems. Simulations utilizing ProSim Software, have indicated that COPs in the range of 4 (vs. 2.4 for comparable operating conditions provided by GE for GeoSpring hybrid) are attainable in advanced hybrid hot water heaters utilizing the Kuel-CellTM electrochemical compressor. And thus a smaller size 350 Watt compressor can be engaged, with alternative form factors in addition to other benefits such as noiseless and vibration free operation. Key components for this cell have been specified and need to be optimized. A work plan has been provided to develop discrete components and eventually build a bench top prototype during phase 1 of this SBIR program with a vision towards development of a product that can be commercialized during phase II (if awarded). The improved efficiency of the system (i.e. COP) not only enables a smaller size compressor to be utilized, but also results in significant reduction in operating costs (i.e. electric power utilization). In addition, the compressor provides an alternative form factor for designers. When all this is taken in conjunction with other inherent benefits of electrochemical compression such as noise-less operation, vibration free operation, and the use of a non-GWP refrigerant provide a compelling value proposition that would inspire significant market interest and penetration, which in turn would result in the development of serious sales volumes which will be required to attain mass production. Once the product is mass produced, the proposal has demonstrated how cost targets enabling market pricing of $500 can be met.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

9 SBIR/STTR records share this UEI (2013–2020). Reported award amounts total $4,589,554. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Environmental Protection Agency

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.