SBIR/STTR Research Award

Wind Tunnel Balance Correction for Structural Motion Effects

Award identifier f2e9d90225f11d2cfe4a8141875249205c33803af87605f06381ab45726ee2fdAwarding agency Department of Defense · Air Force

Award amount

$749,985

Program and phase

SBIR · Phase II

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
M4 ENGINEERING, INC.
Proposal award date
2012-12-11
Contract end date
2014-12-10
UEI
DM3EW67JLQM1
Solicitation number
2011.2
Topic code
AF112-187

Research abstract

ABSTRACT: M4 Engineering proposes to develop a method for accurately correcting dynamic wind tunnel force measurements by removing components due to inertia and aeroelasticity. This effort will effectively utilize novel sensors to determine inertial loads due to excitation of multiple structural dynamic modes resulting from a broadband loading environment. Methods for system identification and optimal estimation will be included within this development. This work will include demonstration of the proposed technology on a hardware prototype CTS system. The proposed development will create an excellent compliment to modern test and analysis methods. BENEFIT: The new technology developed in this Phase II SBIR will be hardware and software for correcting wind tunnel data for balance motion. The hardware component of the product will be a balance assembly including additional sensors such as accelerometers and gyroscopes in addition to conventional strain gauges. M4 Engineering has initiated discussion with Triumph Aerospace Systems regarding the fabrication of such unique balance hardware. The software that will be developed consists of methods that will be used to accept the output from the hardware and compute the model motion and the associated inertial, aeroelastic, and rigid aerodynamic loads. The first product that this new technology will go into will be wind tunnel instrumentation that measures forces and moments. This type of instrumentation is usually defined as sting balance assemblies. Initial customers will be the Defense Agencies and its contractors. Defense Agencies would include Air Force, NASA, and Navy; and contractors will include Boeing, Lockheed Martin, and Northrop Grumman. These customers are those involved in developing, testing, and/or certifying aerospace vehicles. There are numerous universities performing aerodynamic research and development which are also our potential customers. Customer interaction will ensure development of capability which industry needs. M4 Engineering has begun discussion of this technology with Boeing, Lockheed Martin, and Northrop Grumman. Because this technology will be used in wind tunnel instrumentation, other customers will be those who develop and manufacture wind tunnel instrumentation. While it is important to target customers who are interested in using this technology, it is also important to understand the number of facilities available to conduct wind tunnel testing. While there are certainly wind tunnels worldwide, our initial market research focuses on the United States and Canada. As our technology matures, there will be opportunities to market to the rest of the world. There are 97 major wind tunnels in the United States and Canada. Discriminators are size, accuracy, and other considerations such as whether the balance is a 3-component (normal force, axial force, and pitching moment) or a 6-component (normal force, axial force, pitching moment, side force, yawing moment, and rolling moment). These market size numbers are conservative because there are many other facilities not accounted for since they are not considered major. And there are many other universities conducting aeronautical research. This technology is capable of being used in all wind tunnels not just those considered major. Our technology enhances existing balance capability and the market size estimate is based on figures for existing balances.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

83 SBIR/STTR records share this UEI (2004–2026). Reported award amounts total $30,097,301. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.