SBIR/STTR Research Award

Hydrogen/Bromine Energy Storage System

Award identifier 5ceeced2c21c32e42956496290f3381773ecd2151a6cc8ea2d7f9b6dac64adf1Awarding agency Department of Energy · ARPA-E

Award amount

$225,000

Program and phase

STTR · Phase I

Award year

2012

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
ARPA-E
Recipient company
TVN Systems, Inc.
Proposal award date
2012-10-01
Contract end date
2013-06-30
UEI
Not reported
Solicitation number
Not reported
Topic code
1

Research abstract

"It is our objective to develop a cost effective, durable and reliable hydrogen-bromine flow battery system for small-scale electrical energy storage applications. H2/Br2 flow battery technology has been around for decades, however, the lack of low-cost and durable electrode and membrane materials in addition to non-optimal cell/stack configurations have prevented this technology from widespread deployment. TVN Systems Inc. teams up with research groups at Vanderbilt University and The University of Kansas to develop innovative electrodes, membranes and optimal cell/stack design to reduce cost and to increase cycle life and overall efficiency of an H2/Br2 flow battery system. In Phase I we will (1) identify and fabricate inexpensive and durable electrocatalysts and nanofiber composite membranes to replace platinum-based electrode materials and Nafion membranes, and (2) develop optimal electrode and cell design. In Phase II, a 250W stack module will be developed employing the new materials and optimal cell design to demonstrate the cost reduction and performance gain as opposed to stacks using state-of-the-art materials. A number of modules can be combined in parallel to support large power demands. An analysis on a 2.5kW-4hour energy storage system consisting of ten proposed modules shows that it meets the ARPA-E’s primary targets: 1.2m3 footprint, at least 80% round trip efficiency, lifetime more than 1250 cycles and under $1000 per unit. It can be charged by solar power systems or electric grids to store off-peak electricity at customer’s location. The success of this project will be truly transformational for large-scale H2/Br2 electrochemical energy storage systems to have a greater impact on economic and energy security of the United States."

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.