SBIR/STTR Research Award

New Technology for Electricity Monitoring& Reporting Built into Electrical Receptacles and Switshes

Award identifier c2b244b621264f2915337bad6f66c7eff0fa00e59505e67da38de94163286e58Awarding agency Environmental Protection Agency

Award amount

$79,821

Program and phase

SBIR · Phase I

Award year

2012

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Environmental Protection Agency
Branch
Not reported
Recipient company
ThornProducts, LLC
Proposal award date
2012-03-01
Contract end date
2012-08-31
UEI
MC15LER81JJ6
Solicitation number
Not reported
Topic code
D

Research abstract

This EPA SBIR Phase I proposal addresses the need for more widespread electricity usage conservation and user cost reduction via behavioral changes and via efficiency improvement. Efficiency improvements are through equipment and appliance change out but also via long term efficiency monitoring. This needs to be a sustaining level of conservation and efficiency verification as opposed to a one time effort. The current problem is that more location specific usage information is needed to direct users and building managers to where the best spots are to focus their ongoing efforts. Present monitoring and reporting solutions do not provide the “all points monitored” or they make it too expensive and too much user complexity to implement. A solution is a very economical, short Return-On-Investment method for getting electricity usage from every point in the building or home along with quick to understand near real time report including targeted advice so that the best action to take is obvious. ThornProducts intend to provide this via economical electricity monitoring built into the sockets, switches and into miniature wired-in-line device for hardwired devices. This requires a new innovative simple but reliable transmission method to a central receiver so that the components of the sender circuitry can be small, simple, ultra-low power and very economical putting the workload on the receiver unit. The receiver will also provide compatibility with existing management systems and portals via the central receiver.The primary purpose of this Phase I SBIR project is to develop at a lab level this new transmission technology. Verification test will be done in the lab and a very small live building test. This Phase I sender and receiver breadboard test units will not be a [production design but research will occur to verify their feasibility. A demonstration of an easy to understand user interface will also be provided. Preliminary study and lab work has been done by ThornProducts to demonstrate what is planned and to make some progress on credibility that a very small and very low power consumption sender unit and a simple transmission/communication method is feasible. Subsequent product commercialization would provide the actual sender circuitry, full capability central receiver design (hardware and software) and simple user interface via a web portal server and FCC, UL, CSA and similar industry certifications.

Technology keywords

Not reported

Agency intelligence

Environmental Protection Agency

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.