SBIR/STTR Research Award

Automated Fastener Installation System

Award identifier f97ac4f77ce7d5b1151c2fa224f4e1d39f63fda7e81da43900fb1944fc493a18Awarding agency Department of Defense · Air Force

Award amount

$4,100,000

Program and phase

SBIR · Phase II

Award year

2012

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
Variation Reduction Solutions Inc
Proposal award date
2012-01-24
Contract end date
Not reported
UEI
Not reported
Solicitation number
2010.3
Topic code
AF103C-148

Research abstract

ABSTRACT: Sorting, solvent-cleaning, promoting, delivering, sealing and installing 30,000 fasteners per day is a critical task required for full-rate production of the F-35 Lightning II. These 30,000 fasteners are comprised of approximately 350 unique part numbers and each must receive one of three different promoter solutions and sealers, each with time-limited properties. Preparing the fasteners in a way that does not result in an equal number of daily machine cycles is essential to prevent excessive Mean Time Between Failures (MTBF) and Mean Time To Repair (MTTR) issues over the long F-35 program life. To meet the technical requirements as well as the larger system robustness challenge, VRSI has established a process to prepare the fasteners with over 300 times fewer machine cycles than an individually prepared fastener process. This also results in less complexity, moving parts, system cost and time to prepare. The system consists of modular commercial and custom-designed sub-systems integrated into an affordable manufacturing solution to solve the fastener preparation challenge. These operations are organized, controlled and prompted via an electronic Dynamic Bill of Materials (DBOM) that captures the as-built condition of the aircraft. The DBOM will be used to drive the daily fastener kitting process as well as organize the manual sealing and installation through the use of optically projected work instructions on the aircraft skin. BENEFIT: No longer will the operators spend over 60% of their day manually preparing fasteners and releasing Volatile Organic Compounds (VOC"s) into the work environment. No longer will thousands of additional fasteners be prepared only to be Return-To-Stores (RTS) or thrown out. No longer will F-35 fastener preparation represent such a large technical challenge. This is because VRSI and its supporting technical team has addressed and met every requirement: Safe work environment Minimum number of operators Affordable system with consistent quality Continuous digital thread from DBOM to installation 30,000 fasteners per day despite 10% random grip length variation from aircraft to aircraft Designed for low machine cycles per fastener quantities to insure optimal MTBF Near-zero return to stock using accurate DBOM Near-zero VOC control using an airless acetone cleaning system Surface preparation per the promoter specifications Blind fastener preparation system for addressing exceptions to the standard process Inventory control through electronic monitoring of incoming and outgoing fasteners Preparation and delivery in 6 hours or less (depending on variant) Completely sealed delivery containers for maximum promoter life extension Clear fastener tray labeling with part numbers and bar codes Central Human Machine Interface (HMI) system control Integration with LMA"s data systems Expandable for additional fasteners, nut plates and brackets Project plan to meet MRL5, MRL6 and MRL7 demonstration requirements Successful experience transitioning technology from SBIR Phase II to production

Technology keywords

Not reported

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.