SBIR/STTR Research Award

Rapidly Deployable Lightweight Shelters for Austere Environments

Award identifier 58815d817ae9808d660287cf91e052b218305038bc2d42b2936dc0403d44878eAwarding agency Department of Defense · Army

Award amount

$98,678

Program and phase

SBIR · Phase I

Award year

2012

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Army
Recipient company
Federal-Fabrics-Fibers, Inc.
Proposal award date
2011-10-28
Contract end date
Not reported
UEI
V5PDWML2J195
Solicitation number
2011.2
Topic code
A11-099

Research abstract

Federal Fabrics-Fibers Inc. (FFF) produces several sizes and versions of AirBeam supported shelters. These shelters range in size from 15 to 40 wide with lengths ranging from 15 to 70 feet. The shelters are designed for rapid setup, high reliability, and relatively long term deployment. Standard designs are for normal military specifications including operation temperatures ranging from 40 to 125 degrees F (-40 to 52 degrees C), steady winds of 55 mph, with gusts up to 65 mph, and snow loads of 10 Lb/ft2 (PSF). FFFs shelters are rapidly deployable using minimal man power, with very fast Time Under Canopy. Shelters have been produced with man doors and cargo doors of various sizes. An FFF AirBeam supported shelter, even up to 30 wide, can easily be set up by only two persons in under 20 minutes, additional time will be necessary to fully secure the system to meet full load capabilities. Shelters to meet the austere environments called out in this proposal request will be exposed to winds of 100 mph, temperatures of -58 to 140 degrees F (-50 to 60 degrees C), and 20 PSF. These conditions are a bit more stringent that those for which FFFs shelters are typically designed, however, with minor modifications they are not outside FFFs shelters capabilities. The goal of this Phase one effort will be to expand the design criteria of Federal Fabrics-Fibers Inc. existing AirFrame supported shelters to meet the additional demands imposed by Austere Environments.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

32 SBIR/STTR records share this UEI (1993–2021). Reported award amounts total $6,548,469. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.