SBIR/STTR Research Award

High Sensitivity Beam Position Monitors for 1300 MHz Croyomodules

Award identifier 6ef4e3ac881e8ee1befe2c3e08f0f8ed7ba722748539e317915d21faca4a2518Awarding agency Department of Energy

Award amount

$793,017

Program and phase

SBIR · Phase II

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Far-Tech, Inc.
Proposal award date
2011-08-15
Contract end date
2013-08-14
UEI
LZ6MNQGKZSV3
Solicitation number
DE-FOA-0000508
Topic code
63 d

Research abstract

The proposed International Linear Collider will require a high-accuracy beam position monitor (BPM) at each quadrupole magnet to aid with beam alignment and as an input to feedforward schemes to cancel alignment errors. In order to meet the requirements of ILC, the BPMs will require sub-micron position resolution, fast transient response, and a relatively large clear aperture of 78 mm. FAR-TECH, Inc. proposes a dielectric-loaded BPM that uses a novel coupling scheme. These features allow the BPM to fit in a very small space of 2 inches. The dielectric loading also increases the cavity shunt impedance and allows greater sensitivity than a comparable bare cavity. Commercial Applications and Other Benefits: The International Linear Collider promises to shed new light on fundamental processes at the highest energy collision scales, and complement the physics program at the Large Hadron Collider. Sub-micron beam position measurements are crucial to beam emittance preservation and control in this machine. FAR-TECH, Inc. hopes to commercialize the BPM design and create one additional source of BPM systems for the eventual construction of the ILC and other high energy and nuclear physics applications. Two cavities will be tested and subsequently used as diagnostics for the Argonne Wakefield Accelerator upgrade.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

79 SBIR/STTR records share this UEI (1995–2019). Reported award amounts total $24,887,995. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.