Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- DIVERSIFIED TECHNOLOGIES, INC.
- Proposal award date
- 2011-08-15
- Contract end date
- 2013-08-14
- UEI
- ZNG4WKWT2YM4
- Solicitation number
- DE-FOA-0000508
- Topic code
- 65 d
Research abstract
The next generation of particle accelerators will require large numbers of RF cavities, producing field gradients undreamt of a dozen years ago. The next frontier is high energy, short pulse modulators, continuing the technical thrust begun under recent colliders and numerous X-Band accelerator designs. Modulators to drive the klystrons for these new accelerators must meet aggressive requirements for pulse risetime, flatness, and repeatability requirements, at hundreds of kV. For short-pulse modulators, the Marx topology provides a means to achieve astounding risetimes and flattop control that are simply not available with hybrid (switch / pulse transformer) topologies. The basic proof of principle of solid-state Marx architectures has been demonstrated by several organizations, but deployable solutions for high voltage, short-pulse accelerators have not been available as of yet. In our Phase I effort, we have demonstrated a prototype Marx modulator design with the performance, affordability, and reliability necessary for this new class of accelerators. This proposed effort is focused on advancing the Marx modulator design developed in Phase I from a prototype to a fully functional, installed system for the 500 kV operation of a magnicon tube. Commercial Applications and Other Benefits: A key benefit of this SBIR effort, therefore, is to reduce the cost of solid-state modulator designs significantly, allowing them to finally undercut the cost of conventional designs, while providing higher levels of pulse control, reliability, and efficiency. RF systems, primarily the klystrons and modulators, typically account for over one-third of the construction cost of a new accelerator. A significant reduction in modulator costs, therefore, has an appreciable impact on the price tag for any accelerator.
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
Research funding history
166 SBIR/STTR records share this UEI (1989–2025). Reported award amounts total $65,542,650. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Defense, Department of Energy, Department of Agriculture, Environmental Protection Agency, National Science Foundation
Agency intelligence
Department of Energy
Back to SBIR/STTR Research Awards