SBIR/STTR Research Award

Fast Response ACS (FRACS) for Interceptor Booster Stage Separation Control

Award identifier 804667dded199617b575a23d4186d51f043b9fbd5d8e1dfea70ba0809ca9c5e2Awarding agency Department of Defense · Missile Defense Agency

Award amount

$99,845

Program and phase

SBIR · Phase I

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Missile Defense Agency
Recipient company
VALLEY TECH SYSTEMS INC
Proposal award date
2011-06-23
Contract end date
Not reported
UEI
XADCKF4YLAZ3
Solicitation number
2010.3
Topic code
MDA10-013

Research abstract

During missile staging, large unexpected torque loads have historically been problematic in causing periodic flight anomalies and in some cases catastrophic flight failures. As compared to typical requirements for booster Attitude Control Systems (ACS), the staging loads are short in duration,<1 sec, and up to 10x in magnitude. This large difference in ACS requirements has developed a need for a dedicated lightweight, low cost, and highly reliable booster staging ACS. To address this need VTS is proposing a new Fast Response ACS (FRACS) that uses Electric Solid Propellant (ESP) propulsion system. The ESP propulsion system is ignited, extinguished and throttled with electricity without the need for pyrogen or explosive squibs. ESP"s are also inherently insensitive, non-toxic and environmentally green throughout the manufacturing and operation.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

33 SBIR/STTR records share this UEI (2006–2021). Reported award amounts total $24,841,746. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.