SBIR/STTR Research Award

Reconfigurable Secondary Composite Building Blocks for Expandable Habitable Structure

Award identifier c4ca9d4180e83f79aba8e2f6c65fe1e42675a3a07ab7db85434ad973a18ab60eAwarding agency National Aeronautics and Space Administration

Award amount

$99,910

Program and phase

SBIR · Phase I

Award year

2011

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
ZIN TECHNOLOGIES, INC.
Proposal award date
2011-02-18
Contract end date
2011-09-29
UEI
Y9Y3LLQKWDN1
Solicitation number
Not reported
Topic code
X5.01

Research abstract

ZIN Technologies, Inc. will provide a preliminary design showing the feasibility of a Reconfigurable Multi-functional Architecture (RMA) for a deployable floor secondary structure.This will address NASA requirements for innovative deployable secondary structures that have minimal mass, high packaging efficiency, and multi-functional utilization. The primary usage of the floor will be to provide a light weight, deployable walkway for a habitat, which meets the appropriate strength, stiffness, and stability requirements. In Phase 1, ZIN will design, analyze and breadboard the necessary joints to enable the structure to be readily deployed and/or un-deployed, while maintaining the appropriate stiffness. The secondary purpose of the floor will be to take advantage of the walkway's cross sectional geometry and utilize it to provide water storage within the floor. The floor will house electrical and plumbing interfaces, which will connect these utilities between two sides of the module. An addition of electrical outlets within the structure will be provided upon need. Possible features include making the floor reconfigurable to serve as a radiation shield. ZIN will develop universal joints, to enable crew members to disassemble the flooring system and re-assemble it into other secondary or EVA structures. The proposed Phase 1 effort will be geared towards a full scale Phase 2 demonstrator, to show the floor system usage in a relevant environment and raise the Technology Readiness Level (TRL) of RMA structures. The RMA structure we propose will provide a highly robust, stiff and mass efficient surface within a primary structure that will enable the useful outfitting and pre-integration of subsystems within the primary volume

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

9 SBIR/STTR records share this UEI (2002–2020). Reported award amounts total $2,393,444. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.