Integration of PALACE and Touchdown Planning Methods for Landing CUAS at Unprepared Sites
Award amount
$99,884Program and phase
STTR · Phase IAward year
2010Award details
- Awarding agency
- Department of Defense
- Branch
- Navy
- Recipient company
- AURORA FLIGHT SCIENCES CORPORATION
- Proposal award date
- 2010-06-28
- Contract end date
- 2011-07-08
- UEI
- K1L1BZLNPWC4
- Solicitation number
- 2010.A
- Topic code
- N10A-T039
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- RApid Verification and Validation Techniques (RAVVT)
- Aerial Aquatic Ordnance Removal Vehicle (AEQUOR-V)
- Spacecraft Swarm Coordination and Planning Tool
- Vertical Lift by Series Hybrid Power
- Tool for Collaborative Autonomy
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Autonomous Rotorcraft Operations from Unprepared Sites
- Integration of PALACE and Touchdown Planning Methods for Landing CUAS at Unprepared Sites
- Autonomous Landing at Unprepared Sites for a Cargo Unmanned Air System
- Autonomous Landing at Unprepared Sites for a Cargo Unmanned Air System
- Autonomous Landing at Unprepared Sites for a Cargo Unmanned Air System
Research funding history
172 SBIR/STTR records share this UEI (1990–2017). Reported award amounts total $52,953,955. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation, Department of Commerce
Contractor profile
AURORA FLIGHT SCIENCES CORPORATION
Historical federal award activity, when published, is on that contractor profile. Matched by UEI only.
Agency intelligence
NAICS intelligence
This classification comes from the contractor profile, not from the SBIR award record.