SBIR/STTR Research Award

Innovative Structures for Sonobuoy Applications

Award identifier 3faf30d3913137f2b88a7495c9162085585ee826af971a1749269bf0ba647e39Awarding agency Department of Defense · Navy

Award amount

$79,984

Program and phase

SBIR · Phase I

Award year

2010

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
SEALANDAIRE TECHNOLOGIES, INC.
Proposal award date
2010-04-19
Contract end date
2010-10-19
UEI
M832S92BP7S3
Solicitation number
2010.1
Topic code
N101-021

Research abstract

Problem: Present sonobuoys such as the AN/SSQ-101 ADAR were designed for “standard” blue water ocean conditions using a highly idealized 90% current profile, with designs checked in simulation. As such, the sonobuoys do not perform optimally in all oceanographic conditions; for example, complex current shears cause the ADAR array to develop unacceptable tilt angles and kite up to shallower depths outside the specification. Opportunity: In complex littoral environments it would be a significant improvement for the ADAR sonobuoy suspension to adapt itself to the present environmental conditions and situation-dependent mission objectives, thereby ensuring its full uncompromised potential is realized in more scenarios. SeaLandAire proposes an innovative, adaptable suspension system which would provide significant hydrodynamic performance advantages over the present ADAR design and offer potential widespread application in other free-drifting acoustic sensors. The addition of the Adaptable Element for Suspension OPtimization (AESOP) to the present ADAR would minimize the array tilt and kiting problems in situ as well as allow buoy field integrity management. The challenge, though, is to adjust the AESOP properly for non-standard flow conditions with minimal impact to the packaging, deployment, and acoustic performance of the existing A-size ADAR system.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

57 SBIR/STTR records share this UEI (1998–2025). Reported award amounts total $24,234,799. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Commerce

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.