SBIR/STTR Research Award

Aircraft fatigue damage inspection

Award identifier 84547b48608adea7118f02863bbee6bd81e1c9ceb90104a177c4e189dea2a77dAwarding agency Department of Defense · Air Force

Award amount

$100,000

Program and phase

SBIR · Phase I

Award year

2009

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
TEXAS RESEARCH INSTITUTE , AUSTIN, INC.
Proposal award date
2009-04-22
Contract end date
2010-01-22
UEI
LM1NWMDNNQ18
Solicitation number
2008.3
Topic code
AF083-246

Research abstract

Currently to inspect for fatigue damage around fasteners in multi-layer structures requires either removing the fastener entirely or a perfect sealant layer between the layers for ultrasonic testing.  We propose developing a novel inspection system that uses acoustic emission to inspect the multi-layer structures.  Our approach does not require removing, modifying, or altering in any way the fastener nor the multi-layer structure.  During Phase I we will develop the initial prototypical design of our inspection system, construct a prototype, and demonstrate its ability to detect corner flaws in the multi-layer structure around fasteners.  Future efforts will be devoted to moving from the lab to the field to provide the Air Force with a practical, easy-to-use inspection solution.  TRI is currently using the LAHMP AE system to monitor fatigue cracks in C-5 skins.  The lessons learned in this internally funded C-5 project will form the basis for the proposed Phase I work. BENEFIT: Studies have shown that reducing the number of fastener removals required for inspection can save the Air Force millions, as much as $65 million dollars for the B-1B alone.  Since our system drops the number of fastener removals to zero, we anticipate that even more significant savings can be realized by the Air Force.  In addition, due to the ubiquitous nature of multi-layer structures in aerospace, we anticipate similar savings can be realized by the Navy, Marines, and commercial airlines.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

416 SBIR/STTR records share this UEI (1983–2025). Reported award amounts total $140,672,616. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Transportation, Department of Commerce, National Science Foundation, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.