SBIR/STTR Research Award

Laser Femto-Tesla Magnetic Gradiometer (LFMG)

Award identifier ec4bdb478f72dae75959c682dfa337af369b32d8188846833b30d8bfe89916b1Awarding agency National Aeronautics and Space Administration

Award amount

$99,078

Program and phase

SBIR · Phase I

Award year

2009

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
POLATOMIC, INC.
Proposal award date
2009-01-22
Contract end date
2009-07-22
UEI
MC4NM5LXZTE8
Solicitation number
Not reported
Topic code
S1.06

Research abstract

This Phase 1 SBIR proposal describes development of a conceptual design for a Laser Femto-Tesla Magnetic Gradiometer (LFMG). The LFMG innovations include the ability to make both extremely high-resolution scalar field measurements (10 fT/rtHz) as well as stable and accurate scalar gradiometer measurements. The high stability of the gradiometer measurements makes possible exploratory investigations of temporal variations and gradients in the magnetic field at the Earth's surface due to crustal field changes, core changes, ELF and ULF magnetospheric disturbances, and surface electromagnetic effects associated with earthquakes and volcanic activity. LFMG instruments can be deployed as station magnetometers in gradiometer arrays to monitor geopotential gradient variations over ranges from meters to kilometers. Recently, an extremely high-resolution scalar measurement technique achieving 39 pT/rtHz sensitivity was demonstrated under Navy sponsorship. High-accuracy data linking for vector gradient measurement was demonstrated under the ONR 3MDS Program. The LFMG combines these key innovations to develop an instrument for exploratory research in geomagnetism. The Phase 1 effort will result in an LFMG conceptual design and establish the feasibility of designing and fabricating a brass-board in Phase 2. A plan for the LFMG brass-board installation, calibration, and performance evaluation will be developed for demonstration in Phase 2. The TRL is expected to be 4 at the end of the Phase 1 contract.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

53 SBIR/STTR records share this UEI (1985–2021). Reported award amounts total $21,206,548. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.