SBIR/STTR Research Award

Rapid Low Cost Application of Adhesive Tangs for Support of Shipboard Fire Protection Materials

Award identifier f0a6ac736fcdbbf0751d35ec89ac0166f252cbec4550828b8f8d6914e4be7edfAwarding agency Department of Defense · Navy

Award amount

$70,000

Program and phase

SBIR · Phase I

Award year

2008

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
KaZaK Composites Incorporated
Proposal award date
2008-09-17
Contract end date
2009-03-26
UEI
NE6AZWKUS6Z7
Solicitation number
2008.2
Topic code
N08-180

Research abstract

The next generation of U.S. Navy combatants is currently under design with topside structures considering composite materials. Composite topside structures will reduce weight, provide significantly reduced RCS signatures and assist the Navy to meet performance goals. Development of Navy topside structures has evolved based on prior experience which has included the design and construction of the AMES Mast, Forward Director Room (first article) and more recently the extensive research and development to qualify the design of the DDG Composite Helicopter Hangar. Several current composite programs, the design and manufacture of the DDG 1000 topside structure and NSRP’s Improved Affordability for Composite Structure are working to reduce cost, weight and manufacturing complexity. An adhesive tang system that supports shipboard passive fire protection is another step to outfitting a composite topside structure. KaZaK’s Phase I efforts will work with a shipyard to define system requirements, further refine/develop its proposed innovations through analysis and fire, smoke and toxicity testing (FST), while refining designs and laboratory qualification testing during Phase II. KaZaK will investigate a novel material construction that has been used with great success in other design problems that required a balance between FST requirements, adhesion and structural support at low cost.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

156 SBIR/STTR records share this UEI (1995–2011). Reported award amounts total $40,421,900. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Transportation, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.