SBIR/STTR Research Award

Tough Reconfigurable Topside Shipbuilding Manufacturing Structure

Award identifier adb476a9cbd71164722b1981f284ecbe94a1ef2e354fb9044dbfcecdc32e77dfAwarding agency Department of Defense · Navy

Award amount

$70,000

Program and phase

SBIR · Phase I

Award year

2008

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
KaZaK Composites Incorporated
Proposal award date
2008-09-16
Contract end date
2009-03-25
UEI
NE6AZWKUS6Z7
Solicitation number
2008.2
Topic code
N08-179

Research abstract

Military and emergency civilian shelters are typically designed for mobile operations with relatively short set-up/strike cycles. Durability with minimal maintenance and logistical support are then essential. These characteristics also hold true for shipyard construction and environmental structures. However unlike military and civilian structures, topside shipyard structures must withstand grinding, hot work and day to day use in a manufacturing environment. In addition ship topside structures vary in geometric complexity, material and accessibility. The shelter system must also be designed to withstand high winds, ice and snow loads. KaZaK’s Phase I efforts will work with shipyards to define shelter requirements, then further refine/develop proposed innovations through analysis and scaled prototype models, while refining designs and full scale testing during Phase II. KaZaK will investigate a novel composite material construction in combination with a highly automated panel production process that has been used with great success in other structural design problems that required a balance between deployed stiffness, durability and low cost. Full scale Navy/shipyard prototype fabrication/assembly and shelter testing is anticipated by the end of Phase II.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

156 SBIR/STTR records share this UEI (1995–2011). Reported award amounts total $40,421,900. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Transportation, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.