High Altitude, Deployable, Carbon Fiber Composite Wing Kit with Very High Lift to Drag Ratio
Award amount
$99,000Program and phase
SBIR · Phase IAward year
2008Award details
- Awarding agency
- Department of Defense
- Branch
- Defense Advanced Research Projects Agency
- Recipient company
- KaZaK Composites Incorporated
- Proposal award date
- 2008-01-18
- Contract end date
- 2008-07-30
- UEI
- NE6AZWKUS6Z7
- Solicitation number
- 2007.2
- Topic code
- SB072-042
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- MMF&EFM: an innovative science-based methodology for modeling and simulating Composite Materials for Durability
- High Corrosion Resistance, Durable, Light Weight Bulkhead/Deck Mounted Hazardous Material Satellite Storage Lockers
- Design and Manufacturing Process Automation for Next-Generation Composite Missile Canisters
- Novel Towed Array Hose Materials Technology
- Lightweight UTDS Compatible Deck Surfacing
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Low-Stored-Volume Wings for a Very High Altitude Aircraft
- Low-Stored-Volume Wings for a Very High Altitude Aircraft
- Low Stored Volume Deployable Wings for High Altitude Aircraft
- STOWED UNMANNED AIR VEHICLE ENGINEERING, SUAVE
- Low Stored Volume Deployable Wings for High Altitude Aircraft
Research funding history
156 SBIR/STTR records share this UEI (1995–2011). Reported award amounts total $40,421,900. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Transportation, National Science Foundation