SBIR/STTR Research Award

Novel Low Cost Thin Ply Composite Shafting for Power Transmission

Award identifier a7a044087795bfe71a1a7e841a54eebc35def845937dfcd08dce7936f1987b6aAwarding agency Department of Defense · Navy

Award amount

$100,000

Program and phase

SBIR · Phase I

Award year

2007

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
KaZaK Composites Incorporated
Proposal award date
2007-06-26
Contract end date
2008-01-09
UEI
NE6AZWKUS6Z7
Solicitation number
2007.1
Topic code
N07-061

Research abstract

Air Cushion Vehicles (ACV) utilizes steel shafts to transmit power to the propeller and lifting fans. These shafts are exposed to severe environments including constant salt spray, sand particles, and extreme dynamic loading. The next generation ACV, Joint Maritime Assault Connector (JMAC), will require greater lift capacity, increasing power transmission needs up to 65%. Scaling current baseline steel shaft designs to accommodate increased JMAC requirements would add considerable weight, unacceptably reducing payload. Because they are easily installed and removed, composite shafting provides a low risk path to weight reduction in both current and future ACVs. Composites offer the ability to tailor laminates to specific loads, while providing superior vibration damping. KaZaK proposes to provide the Navy with a composite shaft solution evolved by comparing alternative material and manufacturing processes optimized for the unique ACV operating constraints, resulting a shaft with the lowest possible acquisition and life cycle cost while meeting all performance objectives. Use of novel “Thin-Ply” technology will improve damage tolerance and fatigue life, reduce maintenance cost and improve maintenance schedule, while providing a weight efficient solution. Final designs will be validated through Phase I prototype testing in preparation for full scale development and test in Phase II.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

156 SBIR/STTR records share this UEI (1995–2011). Reported award amounts total $40,421,900. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Transportation, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.