SBIR/STTR Research Award

Techniques, Processes, And Tools For Implementing An Integrated Corrosion Detection System

Award identifier 2c6cd4328ff73cad697c739890163d68650370f4a8d52d84714add6e32692cfeAwarding agency Department of Defense · Navy

Award amount

$149,761

Program and phase

SBIR · Phase I

Award year

2007

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
LASER & PLASMA TECHNOLOGIES LLC
Proposal award date
2007-05-07
Contract end date
2007-11-07
UEI
V51ALYLF22G4
Solicitation number
2007.1
Topic code
N07-038

Research abstract

Under SBIR Program Solicitation FY07.1, Navy Topic N07-038 entitled, "Techniques, Processes and Tools for Implementing an Integrated Corrosion Detection System”, the NAVY has identified a need for the development of techniques, processes and tools for corrosion detection in large military aircraft. The technical problem being addressed in Navy Topic N07-038 arises from the limitations of the current methods of detecting corrosion in large military aircraft by manual inspection of aircraft surfaces by maintainers in the field and at the depot level. Furthermore, these schedule-based detection methods are time consuming and quality of inspection is limited to detection by the human eye. Also, inspection in non line-of sight and tight spaces is not possible without a borescope or other item of non-destructive inspection equipment. To solve these problems, the Navy is seeking methods to identify early signs of corrosion and alert maintainers for detailed inspection based on physics of failure. In response to this need, Laser and Plasma Technologies, Inc. (LPT) proposes the use of optical methods such as color change under strain created due to corrosion process, optical scanning method and optical shearography to develop an efficient, compact system for corrosion detection as well as the application of physics of failure to this problem. The Investigators anticipate success in both the development of early detection system using novel optical methods and its relationship to structural integrity based on the unique symbiosis in capabilities found in the collaboration between LPT and the Subcontractor to the program, the University of Virginia.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

14 SBIR/STTR records share this UEI (2007–2023). Reported award amounts total $8,801,455. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.