SBIR/STTR Research Award
HMMWV Towable Load Following 100 kW Power Unit
Award amount
$69,193Program and phase
SBIR · Phase IAward year
2007Award details
- Awarding agency
- Department of Defense
- Branch
- Army
- Recipient company
- Energent Corporation
- Proposal award date
- 2006-12-01
- Contract end date
- 2007-06-01
- UEI
- Not reported
- Solicitation number
- 2006.2
- Topic code
- A06-190
Research abstract
A high efficiency, towable 100 kW power plant is proposed based on a newly developed turbine. The new turbine, the dual pressure Euler turbine, is highly efficient and can operate in dusty environments with poor quality fuels. The power plant has a power density more than 4 times greater than existing power plants and is 1/4 the weight. A tradeoff and design study is proposed. Performance, weight and volume of the final design will be determined. A development and production program will be formulated.
Technology keywords
Not reported
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- HMMWV Towable Load Following 100 kW Power Unit
- HMMWV Towable Load Following 100 kW Power Unit
- HMMWV Towable Load Following 100 kW Power Unit