SBIR/STTR Research Award
Simulation and Analysis of Socio-Technical Risk Using SpecTRM
Award amount
$579,688Program and phase
SBIR · Phase IIAward year
2004Award details
- Awarding agency
- National Aeronautics and Space Administration
- Branch
- Not reported
- Recipient company
- Safeware Engineering Corporation
- Proposal award date
- 2003-12-05
- Contract end date
- 2005-12-04
- UEI
- Not reported
- Solicitation number
- Not reported
- Topic code
- A7.04
Research abstract
We propose to create model-based simulation and analysis tools for
risk management throughout the system life cycle. Rather than using
traditional approaches based on failure events in static engineering
designs, we will treat a system as a dynamic process that is
continually adapting to achieve its ends and to react to changes in
itself and its environment. The original design must not only enforce
appropriate constraints on behavior to ensure safe operation, but the
system must continue to operate safely as changes occur. The process
leading up to an accident (loss event) can be described in terms of an
adaptive feedback function that fails to maintain safety as
performance changes over time to meet a complex set of goals and
values. Using this definition of risk management, we will extend our
commercial system engineering tool set to include model-based
simulation and analysis of risk throughout the system life cycle,
including complex human decision-making, software errors, system
accidents (versus component failure accidents), and organizational risk
factors.
Technology keywords
Not reported
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.