SBIR/STTR Research Award

Advanced Materials and Construction for Preformed Traffic Loops

Award identifier 5a2d3d17fc0accaa609057e25cc4a4ddecb76173a0d2aecf32b43ad06fef0563Awarding agency Department of Transportation

Award amount

$499,815

Program and phase

SBIR · Phase II

Award year

1997

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Transportation
Branch
Not reported
Recipient company
ORINCON
Proposal award date
Not reported
Contract end date
Not reported
UEI
CCNUWJRVK5N5
Solicitation number
Not reported
Topic code
Not reported

Research abstract

With their proven performance, reliability, and low cost, inductive loop sensors are widely employed in traffic monitoring and control. However, the presently used preformed loops suffer from frequent breakage induced by traffic or repaving operations - a need exists to develop a preformed inductive loop that can survive these stresses. Additionally, the performed loop should be immune to changing environmental conditions, should withstand abrasive materials and movement of the pavement, and should be resistant to sealant chemicals and petroleum-based contaminants from road vehicles. ORINCON proposes to develop a Flat Cable Loop design to address the deficiencies of presently available preformed loops. In particular, the design will aim to prevent loop breakage due to thermal and mechanical stress associated with repavig operations and roadway traffic, reduce the cross-section size to fit a 3/8" saw cut, and minimize the connector size between the loop and the home run cable. The loop will be easy to configure and install in the field. In Phase I, ORINCON will formulate the specifications for wire insulation materials, the home run wire, and connector materials and fabrication. To make the design a viable commercial alternative to the presently available preformed loops, the Flat Cable Loop will be supported by thorough cost analysis of materials, manufacturing, and installation. Phase II will include manufacturing of a prototype and thorough field tests of the Flat Cable Loop.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

176 SBIR/STTR records share this UEI (1987–2003). Reported award amounts total $32,730,414. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Health and Human Services, Department of Energy, Department of Transportation, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

Department of Transportation

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.