SBIR/STTR Research Award

ANALYSIS OF THE KEY FEATURES OF THE DEMOUNTABLE TOKAMAK FUSION CORE CONCEPT

Award identifier fe4e8258b9ae9a9ee347d47141557a0c835e1cb5c823dc8ce4e65e35c4480713Awarding agency Department of Energy

Award amount

$462,833

Program and phase

SBIR · Phase II

Award year

1985

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Energy Applications And
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

MORE THAN THREE DECADES HAVE PASSED SINCE THE UNITED STATES EMBARKED ON THE PROGRAM TO DEVELOP FUSION ENERGY. SINCE, 1973, NUMEROUS SYSTEMS STUDIES HAVE PRODUCED CONCEPTUAL FUSION REACTOR DESIGNS THAT HAVE NOT BEEN VIEWED AS MEETING THE NEEDS OF ELECTRIC UTILITIES. THESE STUDIES HAVE FEATURED SUPERCONDUCTING CONFINEMENT TOKAMAKS AND MIRRORS BECAUSE OF THE GREATER UNDERSTANDING OF THEIR PHYSICS BASIS AND THE CONVICTION THAT SUPERCONDUCTING MAGNETS OFFERED THE ONLY HOPE FOR AN ACCEPTABLE POWER BALANCE. HOWEVER, OTHER DESIGN EFFORTS HAVE INCLUDED A VARIETY OF CONFINEMENT CONCEPTS BASED ON NORMALLY CONDUCTING MAGNETS. THESE STUDIES INDICATE THAT THIS MAGNET APPROACH CAN BE ECONOMICALLY ATTRACTIVE PROVIDING THAT HIGH GAIN IS ACHIEVED, SUBJECT TO FIRST WALL HEAT FLUX CONSTRAINTS, AND THAT NEUTRON DOSE TO THE REACTOR INTERNALS IS RECOGNIZED AS A LIMIT. THE PROPOSED WORK IS ON A TOKAMAK CONCEPT THAT HAS BEEN CONCEIVED SUBJECT TO THE ABOVE CONDITIONS. IT IS DIRECTED AT HIGH FIELD OPERATION TO COMPENSATE FOR MODEST BETA PERFORMANCE, HIGH GAIN, AND A REACTOR MAINTENANCE CONFIGURATION FOR THE CHANGEOUT OF NEUTRON DAMAGED CORES. CALLED THE DEMOUNTABLE TOKAMAK FUSION CORE (DTFC) CONCEPT, IT PROVIDES FOR THE REPLACEMENT OF THE CENTER PORTION OF THE TOKAMAK, INCLUDING THE INNER TOROIDAL FIELD COIL ASSEMBLY, THE OH/PF COILS, AND THE FIRST WALL ASSEMBLY. THE OUTER TF COIL ASSEMBLY AND THE MAIN BLANKET ARE ONLY INFREQUENTLY REPLACED. THIS SCENARIO IS CONSISTANT WITH THE FACT THAT REACTOR INTERNALS ARE REPLACED WHEN A TARGET AMOUNT OF ENERGY HAS BEEN DELIVERED (AT A GIVEN NEUTRON DOSE). PHASE I OF THE PROPOSED WORK IS DIRECTED AT KEY TECHNOLOGICAL FEATURES OF THE DTFC; SPECIFICALLY UPGRADING THE REACTOR PERFORMANCE MODEL, CONFIRMING THE NUCLEAR PERFORMANCE, ANALYZING THE TF COIL JOINT AND ANALYZING THE INNER TF COIL - OH INTERFACE.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.