SBIR/STTR Research Award

Recovery Act - A Holistic Approach for In-Situ Cable Condition Monitoring in Nuclear Power Plants

Award identifier 9792e46b3659545bfdd537052e1c7fe5240226e1c20243f3e192165edcad5badAwarding agency Department of Energy

Award amount

$149,733

Program and phase

SBIR · Phase I

Award year

2010

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
ANALYSIS AND MEASUREMENT SERVICES CORPORATION
Proposal award date
Not reported
Contract end date
2010-06-06
UEI
HWG4CG5VK931
Solicitation number
DE-PS02-09ER09-27
Topic code
05 c

Research abstract

In the U.S., almost all 104 operating commercial nuclear power plants have applied or plan to apply for license renewal, and over 50 percent have already received approval. This allows the utilities who own these plants to operate them for up to 60 years, and discussions have already begun for a second round of license renewals to allow nuclear power plants to operate up to 80 years or more. These developments highlight the need for frequent maintenance of the safety-related components of the plant. Of particular interest is the management of cable aging. Although individual cables can be replaced, wholesale replacement is neither a prudent nor a practical aging management strategy. A more cost effective strategy is based on an objective assessment of the condition of the cable and an estimate of its remaining life. However, no single method is currently available that can provide a complete picture of the condition and health of a cable as installed in a nuclear power plant. Therefore, a combination of techniques including insulation test methods and conductor test methods are needed to provide a means for management of aging of nuclear power plant cables. During the proposed project, AMS will investigate the state-of-the-art in cable condition monitoring techniques applicable to nuclear power plant wiring systems, and evaluate them as to their effectiveness to identify degradation mechanisms in cable circuits through objective laboratory experiments. The result of Phase I will be a conceptual design of a comprehensive cable condition monitoring system utilizing wireless technology where applicable. Phase II will develop and test the prototype system that will be conceptualized in Phase I. Commercial Applications and Other Benefits: Successful commercialization of this product will result in a holistic cable health management system using the state-of-the-art in cable condition monitoring techniques, especially those that are adaptable to wireless data transmission. Applications include insulation degradation detection and identification of gross and localized cable and connection problems. The system will have immediate application in nuclear power plants as well as other commercial or industrial facilities interested in effectively managing aging assets.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

69 SBIR/STTR records share this UEI (1984–2024). Reported award amounts total $30,985,297. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Nuclear Regulatory Commission, National Aeronautics and Space Administration, Department of Defense

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.