SBIR/STTR Research Award

Ductile Intermetallic Joining for Heavy Alloy

Award identifier fcbf57bedd5e0ecf55159ac9a8531abb1a9fc9d921987cd5ac6b4d3eee5be22dAwarding agency Department of Defense · Air Force

Award amount

$99,998

Program and phase

SBIR · Phase I

Award year

2001

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
ATS-MER, LLC
Proposal award date
Not reported
Contract end date
Not reported
UEI
F8HABDW7DVG8
Solicitation number
Not reported
Topic code
Not reported

Research abstract

Good ballistic performance results when the maximum kinetic energy is delivered tothe target. Increasing the weight of the projectile achieves this goal. Onereasonable way to enhance the mass behind the nose of the penetrator is to augmentits size. The conflict between increased lethality for large projectiles and limitedfacilities for producing large penetrators leads to a need to join small pieces ofheavy alloy into larger projectiles.A copper joint is not strong enough. Nickel bonding would require a high processing temperature, which would cause grain coarsening and lower strength.A better joining method uses an interlayer that reacts to create a ductile intermetallic compound. Good adhesion is achieved during the temperature transient associated with the bonding but the reaction temperature must be held below the eutectic point ofthe Ni-Fe-W matrix to minimise grain growth. Titanium nickelide, alloyed aluminium nickelide and titanium aluminide have enough tensile strength and ductility to meet the requirements of military projectiles. Corrugating the junction surface area will increase further the strength of thebonding.Using ductile intermetallic compounds as bonding interlayers will lead tostrong joints for tungsten heavy alloy parts that will make possibleproduction of full-scale penetrators for military needs, and larger parts forcivilian use (radiation shields, gyroscope components etc.)

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

464 SBIR/STTR records share this UEI (1985–2018). Reported award amounts total $100,117,977. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration, National Science Foundation, Environmental Protection Agency, Department of Transportation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.