Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- National Aeronautics and Space Administration
- Branch
- Not reported
- Recipient company
- ROLLING HILLS RESEARCH CORP
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- FJJKN8NZBL51
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
THE DEVELOPMENT OF A MULTI-COMPONENT, FORCE-AND-MOMENT BALANCE FOR APPLICATIONS IN LOW-SPEED FLOW VISUALIZATION WATER TUNNELS IS THE GOAL OF THIS PROJECT. THE BALANCE WILLALLOW DETAILED FLOW VISUALIZATION AND FORCE-AND-MOMENT MEASUREMENTS TO BE PERFORMED SIMULTANEOUSLY IN A WATER TUNNEL, THUS PROVIDING QUANTITATIVE INFORMATION PRIOR TO WIND TUNNEL TESTS. IN ADDITION TO SAVING TIME AND COST OF TESTING, UNCERTAINTIES ASSOCIATED WITH DIFFERENCES IN MODELS, FACILITIES, AND TEST CONDITIONS ARE ELIMINATED. THEBALANCE CAN ALSO PROVIDE A CAPABILITY FOR COMPLICATED DYNAMIC MEASUREMENTS THAT ARE DIFFICULT TO PERFORM IN A WINDTUNNEL. THE LONG-TERM OBJECTIVE IS TO DEVELOP AND TEST A SIX-COMPONENT FORCE-AND-MOMENT BALANCE SYSTEM AND RELATED CALIBRATION EQUIPMENT THAT CAN BE MANUFACTURED AND PRODUCED COMMERCIALLY FOR OTHER WATER TUNNEL USERS IN THIS COUNTRY AND ABROAD. THE PRIMARY GOAL OF PHASE I IS TO DEVELOP PRELIMINARY DESIGNS FOR VARIOUS COMPONENTS OF A FORCE-AND-MOMENT BALANCE. MAJOR IMPROVEMENT AND REFINEMENT EFFORTS WOULD BE CARRIED OUT IN PHASE II TO DEVELOP AND CONSTRUCT A PROTOTYPE OF A FINAL DESIGN, AND EXTENSIVE STATIC AND DYNAMIC TESTS WILL BE PERFORMED TO VERIFY THE PERFORMANCE OF THE SYSTEM AND TO DEVELOP TECHNIQUES FOR VARIOUS APPLICATIONS. THE DEVELOPMENT OF A MULTI-COMPONENT, FORCE-AND-MOMENT BALANCE FOR APPLICATIONS IN LOW-SPEED FLOW VISUALIZATION WATER TUNNELS IS THE GOAL OF THIS PROJECT. THE BALANCE WILLALLOW DETAILED FLOW VISUALIZATION AND FORCE-AND-MOMENT MEASUREMENTS TO BE PERFORMED SIMULTANEOUSLY IN A WATER TUNNEL, THUS PROVIDING QUANTITATIVE INFORMATION PRIOR TO WIND TUNNEL TESTS. IN ADDITION TO SAVING TIME AND COST OF TESTING, UNCERTAINTIES ASSOCIATED WITH DIFFERENCES IN MODELS, FACILITIES, AND TEST CONDITIONS ARE ELIMINATED. THEBALANCE CAN ALSO PROVIDE A CAPABILITY FOR COMPLICATED DYNAMIC MEASUREMENTS THAT ARE DIFFICULT TO PERFORM IN A WINDTUNNEL. THE LONG-TERM OBJECTIVE IS TO DEVELOP AND TEST A SIX-COMPONENT FORCE-AND-MOMENT BALANCE SYSTEM AND RELATED CALIBRATION EQUIPMENT THAT CAN BE MANUFACTURED AND PRODUCED COMMERCIALLY FOR OTHER WATER TUNNEL USERS IN THIS COUNTRY AND ABROAD. THE PRIMARY GOAL OF PHASE I IS TO DEVELOP PRELIMINARY DESIGNS FOR VARIOUS COMPONENTS OF A FORCE-AND-MOMENT BALANCE. MAJOR IMPROVEMENT AND REFINEMENT EFFORTS WOULD BE CARRIED OUT IN PHASE II TO DEVELOP AND CONSTRUCT A PROTOTYPE OF A FINAL DESIGN, AND EXTENSIVE STATIC AND DYNAMIC TESTS WILL BE PERFORMED TO VERIFY THE PERFORMANCE OF THE SYSTEM AND TO DEVELOP TECHNIQUES FOR VARIOUS APPLICATIONS.
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
Research funding history
72 SBIR/STTR records share this UEI (1986–2015). Reported award amounts total $17,215,003. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: National Aeronautics and Space Administration, Department of Defense
Agency intelligence
National Aeronautics and Space Administration
Back to SBIR/STTR Research Awards