SBIR/STTR Research Award

Lightweight Titanium Heat Exchangers

Award identifier 319ebb4be936568a8b774abb36c907417dd1e794f20b4e943936292c6bc3d2e1Awarding agency Department of Defense · Air Force

Award amount

$750,000

Program and phase

SBIR · Phase II

Award year

2003

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
Materials Resources International
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

The evolution of materials in advanced aircraft continues and there is emerging interest from the U.S. Air Force to move titanium alloys into heat exchangers for advanced aircraft. Titanium substitution will lower the weight of nickel base alloy heatexchangers by over 30%, leading to increased fuel economies and performance. The proposed Phase II effort will select a typical aircraft stainless steel bleed air heat exchanger, making the appropriate design and manufacturing changes to substitutetitanium for stainless steel or nickel based alloys. In Phase II, MRi and Lytron, a heat exchanger manufacturing partner, propose to develop braze joining procedures and integrate processes into designs able to fabricate thin sheet titanium plate-fin heatexchangers, similar to those used in stainless steel or aluminum heat exchangers. Phase II work will aim at a development of specific heat exchanger designs, subsequent optimization of braze filler metals, and development of braze cycles and proceduresconsistent with manufacturing methods. Issues such as braze joint geometry, placement of braze filler metals, braze temperatures, braze fixturing and braze conditions on the final braze strength will be investigated. MRi and Lytron will develop designs,investigate fabrication methods and subsequently make up to four prototype units for test at the end of Phase II. Upon completion of these tests, is it expected that the titanium heat exchanger design and manufacturing procedures would be tested andvalidated in preparation for possible flight certification programs.

Technology keywords

Not reported

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.