SBIR/STTR Research Award
A REQUIREMENT EXISTS TO INSPECT AND CALIBRATE TRANSPIRATION COOLED NOSETIPS (TCNT) AND OTHER HARDWARE WHICH UTILIZE TRANSPIRATION COOLING.
Award amount
$49,999Program and phase
SBIR · Phase IAward year
1985Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- Pda Engineering
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- Not reported
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
A REQUIREMENT EXISTS TO INSPECT AND CALIBRATE TRANSPIRATION COOLED NOSETIPS (TCNT) AND OTHER HARDWARE WHICH UTILIZE TRANSPIRATION COOLING. THE PROPOSED PROGRAM ADDRESSES THE FEASIBILITY DEMONSTRATION OF CRITICAL ELEMENTS AND A PRELIMINARY DESIGN OF A HIGH RESOLUTION FULLY AUTOMATED INSPECTION/CALIBRATION SYSTEM. THE PROPOSED PROGRAM CONSISTS OF THE FOLLOWING TECHNICAL TASKS: (1) INTERNAL FLOW ANALYSES, (2) FLOW CONTOUR MAPPING AND (3) SECTOR CALIBRATION. THE ACTUAL FABRICATION AND DEMONSTRATION OF A FULLY AUTOMATED INSPECTION/ CALIBRATION WOULD BE PART OF THE PHASE II PROGRAM.
Technology keywords
Not reported