SBIR/STTR Research Award

A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

Award identifier 70286f806070aedcd1b0161e229ca3ccccbb143e38f380f6ee34446c2ac8f360Awarding agency Department of Energy

Award amount

$48,214

Program and phase

SBIR · Phase I

Award year

1987

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
ENSCO Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISMIC DATA WILL BE RECORDED BY SMALL SEISMIC ARRAYS (< 3-KM APERTURE) LOCATED NEAR THE EXPECTED SEISMOGENIC ZONES. PROCESSING STEPS WILL INCLUDE P PHASE DETECTION; ESTIMATION OF ARRIVAL TIME, AMPLITUDE, AND FREQUENCY; FREQUENCY WAVE NUMBER ANALYSIS TO DETERMINE APPARENT VELOCITY AND AZIMUTH; AND A SCRIPT-MATCHING PROCEDURE TO PREDICT THE AMPLITUDES OF LATER ARRIVING SHEAR PHASES. FREQUENCY WAVE-NUMBER (FK) MEASUREMENTS OF VELOCITYMAY BE USED TO IDENTIFY P PHASES. AZIMUTH AND FREQUENCY ESTIMATES WILL BE USED TO LOCATE THE SOURCE AND DISCRIMINATE BETWEEN EARTHQUAKES AND ARTIFICIAL SOURCES SUCH AS MINE BLASTS. IF THE EXPECTED GROUND MOTIONS FOR LATER-ARRIVING SHEAR PHASES EXCEED A THRESHOLD DEEMED UNSAFE, A SEISMIC SCRAM ALERT WILL BE GIVEN. THIS PROCESSING SCENARIO WILL BE TESTED USING REAL DATA FROM THE NORESS (NORWEGIAN REGIONAL SEISMIC SYSTEM) ARRAY IN NORWAY. SIMULATIONS WILL BE RUN TO DETERMINE IF SEISMIC SCRAM PROCESSING CAN BE ACCOMPLISHED BEFORE THE ARRIVAL OF LARGE DAMAGING SHEAR PHASES AT THE REACTOR SITE.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.