SBIR/STTR Research Award
SUPPRESSION OF CYANIDE FORMATION IN HALL PROCESS POTLINING
Award amount
$150,000Program and phase
SBIR · Phase IIAward year
1991Award details
- Awarding agency
- Environmental Protection Agency
- Branch
- Not reported
- Recipient company
- EMEC Consultants
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- Not reported
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
SPENT POTLINING FROM INDUSTRIAL PRIMARY ALUMINUM PRODUCTION CELLS IS A DESIGNATED HAZARDOUS MATERIAL BECAUSE OF ITS CYANIDE CONTENT. OVER 100,000 TONS OF THIS MATERIAL ARE ANNUALLY LANDFILLED IN THE UNITED STATES. IT WOULD BE DESIRABLE TO AVOID THE FORMATION OF CYANIDE DURING THE OPERATION OF THE CELLS. EMEC CONSULTANTS PROPOSETO INVESTIGATE THE CONDITIONS AT WHICH CYANIDES FORM AND MIGRATE WITHIN THE CELL. IT IS HOPED THAT WAYS TO ELIMINATETHE FORMATION OF CYANIDE CAN BE IDENTIFIED. A POSSIBLE, PROPRIETARY APPROACH IS ALREADY OUTLINED IN THE PROPOSAL. THE EXPERIMENTAL INVESTIGATION OF ITS FEASIBILITY IS PREPARED IN PHASE I, THEN PLANNED TO ACTUALLY BE INITIATED ON INDUSTRIAL ELECTROLYZERS IN PHASE II.
Technology keywords
Not reported