SBIR/STTR Research Award

PHASE AND AMPLITUDE STABILIZATION SYSTEM FOR ELECTRON-BEAM DRIVEN HIGH-POWER MICROWAVE DEVICES

Award identifier 7e897829d7443f8b049ee9c46cac625edf788fea02c9ab7f526fcb01c6224a68Awarding agency Department of Energy

Award amount

$499,891

Program and phase

SBIR · Phase II

Award year

1991

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
DULY RESEARCH, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THE PROPOSED RESEARCH IS AIMED AT ELIMINATING THE SIGNIFICANT GAP THAT EXISTS BETWEEN THE PERFORMANCE OF PRESENT-DAY LINEAR INDUCTION ACCELERATOR (LIA) DRIVEN MICROWAVE DEVICES AND THE LEVEL REQUIRED FOR THESE DEVICES TO BE USEFUL POWER SOURCES FOR FUTURE ADVANCED PARTICLE ACCELERATORS. DURING THE COURSE OF THIS PROJECT, WE WILL DEVELOP AN AMPLITUDE AND PHASE STABILIZATION TECHNIQUE THAT WILL COMPENSATE FOR ELECTRON-BEAM INDUCED FLUCTUATIONS IN THESE PARAMETERS. TOWARD THIS GOAL WE WILL PERFORM CIRCUIT DESIGN AND ANALYSIS, LOW-POWER FEASIBILITY TESTING WHILE SIMULATING AMPLITUDE AND PHASE ERRORS, ASSEMBLING THE NECESSARY HARDWARE FOR A PROTOTYPE STABILIZATION SYSTEM, AND PERFORMING HIGH-POWER FEASIBILITY TESTS ON A RELATIVISTIC KLYSTRON (RK) IN COLLABORATION WITH LBL AND LLNL. AN IMPROVEMENT OF ABOUT AN ORDER OF MAGNITUDE IS DEEMED FEASIBLE WITH THE PROPOSED TECHNIQUE FOR THE AMPLITUDE AND PHASE VARIATIONS MEASURED AT THE OUTPUT OF THERKS.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.