SBIR/STTR Research Award
MULTI-HOLLOW COMPOSITE SHELL BRIDGE DECK
Award amount
$250,000Program and phase
SBIR · Phase IIAward year
1986Award details
- Awarding agency
- Department of Defense
- Branch
- Army
- Recipient company
- U.s. Composites Corp
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- Not reported
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
COMPOSITE MATERIALS OFFER SEVERAL ADVANTAGES OVER METALS FOR PORTABLE BRIDGING: WEIGHT SAVINGS OF 25% OR MORE, CORROSION AND FATIGUE RESISTANCE. THE DESIGN OF A COMPOSITE STRUCTURE IS COMPLEX: COMPOSITE PROPERTIES ARE HIGHLY ANISOTROPIC, MOISTURE ABSORPTION AND TEMPERATURE CHANGES CAUSE CONSIDERABLE STRAINS AND FIT-UP SENSITIVITY IS HIGH. U.S. COMPOSITES WILL DESIGN A COMPOSITE MULTI-HOLLOW BRIDGE DECK BASED ON NEW MANUFACTURING TECHNIQUES INCLUDING BRAIDING AND WET LAMINATION TO ACHIEVE THE NECESSARY PERFORMANCE AT AN ACCEPTABLE COST.CDS MICROCOMPUTER CODES WILL BE USED TO QUICKLY CONVERGE ON A PRELIMINARY DESIGN, THEN A FINAL DESIGN WILL BE VERIFIED BY FINITE ELEMENT ANALYSES. THE DESIGNERS WILL APPLY THEIR EXPERIENCE FROM LARGE, DYNAMICALLY LOADED COMPOSITE ROTORS TO ENSURE ADEQUACY OF THE ENTIRE STRUCTURE: COMPOISTES, METAL ATTACHMENTS AND COMPOSITE/METAL JOINTS.
Technology keywords
Not reported