SBIR/STTR Research Award

LUNAR OXYGEN PRODUCTION BY DIRECT HYDROGEN REDUCTION OF ILMENITE AND VAPOR-PHASE ELECTROLYSIS OF RESULTANT WATER VAPOR APPEARS THE MOST PROMISING METHOD.

Award identifier 4590055188e24e202cb195afb6f98773f14b0ef73f45436c790f0a0038660b73Awarding agency National Aeronautics and Space Administration

Award amount

$50,000

Program and phase

SBIR · Phase I

Award year

1984

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
Carbotek Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

LUNAR OXYGEN PRODUCTION BY DIRECT HYDROGEN REDUCTION OF ILMENITE AND VAPOR-PHASE ELECTROLYSIS OF RESULTANT WATER VAPOR APPEARS THE MOST PROMISING METHOD. THE PRELIMINARY ASPEN SIMULATION MODEL TO BE DEVELOPED WILL BE BASED ON THE ASSUMPTION OF MINING ILMENITE OR REMOVING IT FROM A MARE PIT USING A BUCKET-WHEEL EXCAVATOR FEEDING A SHIFTABLE CONVEYOR SYSTEM; BENEFICIATION OF THE ILMENITE ORE BY SIEVING, ELECTROSTATIC SIZING, MAGNETIC SEPARATION, AND ELECTROSTATIC SEPARATION; PROCESSING OF THE CONCENTRATED ILMENITE ORE BY CONTINUOUS FLUID-BED REDUCTION TO PRODUCE WATER VAPOR WHICH IS ELECTROLYZED TO PRODUCT OXYGEN AND RECYCLED HYDROGEN; AND LIQUEFACTION AND STORAGE OF PRODUCT OXYGEN FOR FUTURE TRANSPORT TO USER FACILITIES. THE PHASE I EFFORT INVOLVES: (1) THE DEVELOPMENT OF THE PRELIMINARY FLOWSHEET FOR THE OVERALL MINING, BENEFICIATION, PROCESSING, AND RECOVERY SCHEME; (2) THE DEVELOPMENT OF THE ASPEN MODEL BASED ON THE PRELIMINARY FLOWSHEET; (3) PRELIMINARY COSTING AND ECONOMIC EVALUATION OF THE OVERALL SCHEME; AND (4) RECOMMENDATIONS FOR FURTHER UPGRADING OF THE MODEL BY IMPROVING DESIGN, PHYSICAL PROPERTY AND COSTING DATA. PHASE I RESULTS WOULD BE EXTENDED IN GREATER DETAIL IN PHASE II TO OPTIMIZE THE CHOICES OF CONCEPTUAL EQUIPMENT AND THEIR COMBINATION TO CONFIRM THE FEASIBILITY OF AN EFFECTIVE OVERALL PROCESS. PROMISING PHASE II RESULTS WOULD JUSTIFY MAJOR ENGINEERING/COST ESTIMATING AND LUNAR PRODUCTION PLANNING IN A FOLLOWING PHASE III PROGRAM.

Technology keywords

Not reported

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.