SBIR/STTR Research Award

Dielectric Wake Field Resonator Accelerator Module

Award identifier cec97f2e0990104e14675685813edaf70229ddf972b269cdf116954cc24c7ad3Awarding agency Department of Energy

Award amount

$0

Program and phase

SBIR · Phase I

Award year

2001

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Omega-P, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

60975 The wake field induced by passage of a high charge bunch along a dielectric-lined wavequide is attractive for high-gradient electron acceleration, such as used in high energy physics research, since no external source of radiation is needed. Recently, it was pointed out that a train of short moderate charge bunches can be arranged to induce cumulative buildup of wake fields. However, a long dielectric-lined waveguide, is required for a long bunch train, leaves the bunches susceptible to serious instability. This project will develop a short dielectric resonator that would allow cumulative buildup of the wake fields, if the wake field reflections from both resonator faces could be synchronized with the period of the bunch train. A short dielectric resonator could allow easier control of transverse beam instabilities than a long dielectric waveguide. In Phase I, transverse instability was investigated for a bunch injected slightly off-axis in a dielectric-line waveguide, and a fair degree of stabilization was exhibited. A simulation of longitudinal wake fields in a dielectric resonator exhibited zones adjacent to each face of the resonator where the wake fields did not resemble those calculated, unless axial boundaries were taken into account. An experimental dielectric wake field resonator was designed and built, and a design for a beamline upgrade was developed, so as to increase the charge/bunch for future experiments. Phase II will upgrade the beamline, including the installation of an alpha magnet to provide higher charge, tighter bunches, along with improved beam focusing into the dielectric resonator. A beam chopper will be constructed to enable an adjustable short train of bunches to pass into the dielectric resonator. Experiments will be performed to observe the cumulative build-up of wake fields from the bunch train. Commercial Applications and Other Benefits as described by the awardee: High-gradient wake fields, induced by the passage of a train of moderate charge bunches, could be an alternative to large, expensive rf-driven systems for acceleration of electrons and positrons to high energy. Significant acceleration in a dielectric resonator could open up sizable markets for future accelerator modules.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.