SBIR/STTR Research Award

200 MW L-Band Annular Beam Klystron for Accelerators

Award identifier 98b9e5b2dccb3ebf9f495394c48a407b6570d4db81d6989f8ae8da4b75b1a849Awarding agency Department of Energy

Award amount

$700,000

Program and phase

SBIR · Phase II

Award year

2006

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
CALABAZAS CREEK RESEARCH, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
M3LBSJNCR1Z5
Solicitation number
DE-FG02-06ER06-09
Topic code
37

Research abstract

Efficient, cost effective high power high frequency drivers are required for advanced accelerators. To address this need, this project will develop a 200 MW, 1.3 GHz Annular Beam Klystron (ABK) that will operate at a lower voltage than conventional klystrons. In Phase I, a preliminary design was developed, with detailed simulations of all critical components. All design goals were shown to be feasible: efficiency over 40%, power exceeding 200 MW, and a perveance of 3 microperv. In Phase II, the design will be refined, detailed mechanical drawings will be prepared, and the annular beam klystron will be fabricated and tested. Commercial Applications and other Benefits as described by the awardee: The ABK would allow significantly lower voltages to be used, compared to conventional klystrons, reducing the cost of the system. Also, compared to other advanced source concepts, the ABK would be mechanically much simpler than a multiple beam klystron, and would have a lower risk than a sheet beam klystron

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

138 SBIR/STTR records share this UEI (1995–2024). Reported award amounts total $43,761,170. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration, National Science Foundation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.