Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- Department of Defense
- Branch
- Navy
- Recipient company
- Silicon Designs, Inc.
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- F86BASF2E2K6
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
ALTHOUGH CONVENTIONAL MASS-SPRING RETARD SENSORS ARE INEXPENSIVE, THEIR POOR RELIABILITY USUALLY REQUIRES THE USE OF TWO DEVICES IN PARALLEL TO ASSURE SWITCH CLOSURE. THE USE OF TWO DEVICES, HOWEVER, HAS AN ADVERSE AFFECT ON S&A SAFETY. G-SWITCHES USED AS RETARD SENSORS IN THE FMU-139 BOMB FUZE ARE CURRENTLY A MAJOR PROBLEM AREA IN THAT PROGRAM. THEIR POOR RELIABILITY IS DUE PRIMARILY TO IMPERFECTIONS IN THE MACHINED SURFACES, CONTAMINATION, AND TOLERANCE STACK-UP WHICH CAUSE HIGH CONTACT RESISTANCE OR LACK OF OPERATION ALTOGETHER. SILICON DESIGNS HAS DEVELOPED A MINIATURE, LOW-COST ACCELEROMETER THAT COMBINES A CAPACITIVE SENSE ELEMENT AND INTEGRATED SENSE ELECTRONICS IN A SINGLE IC PACKAGE. WE HAVE ALSO DEVELOPED AN ACCELERATION THRESHOLD DETECTION CIRCUIT THAT CAN BE INTEGRATED WITH THE SENSE ELECTRONICS. BECAUSE OUR CURRENT ACCELEROMETER'S HYBRID-BASED CONSTRUCTION AND LASER-TRIM CALIBRATION METHOD IS TOO COSTLY FOR USE IN BOMB FUZES, WE PROPOSE TO REDESIGN THE CALIBRATION CIRCUITS SO ALL CIRCUIT FUNCTIONS CAN BE INTEGRATED ONTO A SINGLE CUSTOM IC ALONG WITH THE SENSE ELEMENT. WE HAVE DESCRIBED A BASE-LINE DESIGN FOR SUCH A CHIP IN THIS PROPOSAL. THE RESULTING ELECTRONIC RETARD SENSOR IC WOULD BE VERY RELIABLE DUE TO ITS FABRICATION USING IC TECHNOLOGY.
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
Research funding history
25 SBIR/STTR records share this UEI (1983–2003). Reported award amounts total $4,649,933. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy
Agency intelligence
Department of Defense
Back to SBIR/STTR Research Awards