SBIR/STTR Research Award

A LOW COST INDUCTION LINAC FOR HIGH POWER ELECTRON CYCLOTRONHEATING MILLIMETER WAVE SOURCES

Award identifier 9dbd091d3163e2565a26bb5b5c8efb0ffa895eb1f20fad8d86ac1b4eaf3fc829Awarding agency Department of Energy

Award amount

$47,637

Program and phase

SBIR · Phase I

Award year

1989

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Science Research Laboratory, Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
MKKPT9RCLJQ1
Solicitation number
Not reported
Topic code
Not reported

Research abstract

AMONG THE VARIOUS AUXILIARY HEATING METHODS FOR TOKAMAK PLASMAS, ELECTRON CYCLOTRON HEATING (ECH) OFFERS MANY ADVANTAGES AND CURRENTLY IS FAVORED AS THE PRIMARY HEATING TECHNIQUE FOR FUTURE TOKAMAK DEVICES (COMPACT IGNITION TOKAMAK AND INTERNATIONAL THERMONUCLEAR EXPERIMENTAL REACTOR). THE ULTIMATE SUCCESS OF ECH AS A METHOD OF AUXILIARY HEATING WILL DEPEND ON THE AVAILABILITY OF ECONOMICAL MILLIMETER-WAVE SOURCES AT THE APPROPRIATE FREQUENCIES (250 TO 600 GHZ) AND POWER LEVELS (1 MW). THE FREE-ELECTRON LASER (FEL) AND THE CYCLOTRON AUTORESONANCE MASER (CARM) ARE BOTH CANDIDATES FOR HIGH POWER TUNABLE ECH RADIATION SOURCES. THESE RADIATION SOURCES RELY ON ACCELERATOR FACILITIES TO PROVIDE HIGH ENERGY (1 TO 10 MEV),HIGH AVERAGE POWER (2 TO 50 MW) ELECTRON BEAMS. CONSEQUENTLY, THE DEVELOPMENT OF ECONOMICAL FELS AND CARMS WILL REQUIRE THE AVAILABILITY OF LOW COST, HIGH EFFICIENCY ACCELERATOR TECHNOLOGY. THE INDUCTION LINAC IS THE ACCELERATOR OF CHOICE FOR DRIVING HIGH POWER MILLIMETER-WAVEDEVICES. IT IS UNIQUE IN ITS CAPABILITY TO ACCELERATE HIGH PEAK CURRENTS (1,000 A) TO SEVERAL MEV WITH A HIGH PULSE REPETITION RATE (1,000 HZ), DELIVERING MULTI-MW ELECTRON-BEAM (E-BEAM) POWER TO THE FEL WIGGLER OR CARM RESONATOR. THIS PROJECT INVOLVES THE DEVELOPMENT OF A HIGH REPETITION RATE (20 KHZ) INDUCTION LINAC FOR DRIVING ECH SOURCES. THE DESIGN WILL USE SILICON CONTROLLED, RECTIFIER COMMUTATED, MAGNETIC PULSE COMPRESSION POWER SYSTEMS IN CONJUNCTION WITH COMPACT ACCELERATOR CELL DESIGNS. THE GOAL IS TO DEVELOP A LOW COST AND HIGHLY RELIABLE ACCELERATOR SUITABLE FOR DRIVING HIGH FREQUENCY (250 GHZ), HIGH POWER (1 MW) MICROWAVE SOURCES FOR ECH APPLICATIONS. A PROTOTYPE ACCELERATOR TO BE CONSTRUCTED IN PHASE II WILL BE INSTALLED IN THE HIGH POWER MICROWAVE LABORATORY AT THE MIT PLASMA FUSION CENTER (OR A LABORATORY OF DOE'S CHOICE) WHERE INITIAL MICROWAVE GENERATION EXPERIMENTS WILL BE CONDUCTED.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

228 SBIR/STTR records share this UEI (1984–2020). Reported award amounts total $66,288,679. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Science Foundation, Department of Health and Human Services, National Aeronautics and Space Administration, Department of Transportation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.