SBIR/STTR Research Award

REDESIGN OF AMMONIA ABSORPTION REFRIGERATION UNITS FOR LOW TEMPERATURE APPLICATIONS IN NATURAL GAS PROCESSING

Award identifier 8ddee826e1fe5f5e967ba27e8f82abf5e30b818a62e33759f340c57ce699ab91Awarding agency Department of Energy

Award amount

$75,000

Program and phase

SBIR · Phase I

Award year

1994

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Process Technology Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

GAS TRANSMISSION PIPELINES REQUIRE NATURAL GAS DELIVERED TO THEM TO MEET A HYDROCARBON (HC) DEWPOINT SPECIFICATION IN ORDER THAT THE HC LIQUIDS ARE NOT DROPPED OUT IN THE LINE DURING TRANSMISSION. SIMILAR SPECIFICATIONS ARE IMPOSED BY PLANT OPERATORS ON THE FUEL GAS THAT IS CONSUMED BY THEIR MACHINERY. A MARKET EXISTS FOR AN ECONOMICAL AMMONIA (NH3) ABSORPTION UNIT TO REPLACE COMPRESSION UNITS UTILIZING FREON THAT WILL PRODUCE REFRIGERATION AT TEMPERATURES IN THE RANGE OF -10 DEGREES TO -15 DEGREES FAHRENHEIT. EXISTING COMMERCIALLY AVAILABLE AIR COOLED NH3 ABSORPTION REFRIGERATION UNITS ARE DESIGNED AND MANUFACTURED TO PRODUCE REFRIGERATION IN THE 40 TO 44 DEGREES FAHRENHEIT RANGE WITH AMBIENT AIR TEMPERATURES RANGING FROM 20 TO 100 DEGREES FAHRENHEIT. THE NH3 UNITS ARE SEALED UNITS UTILIZING SIMPLE LOW COST MECHANICAL DEVICES TO REGULATE THE PROCESS FLOW. TO EXTEND THE TEMPERATURE RANGE DOWN TO -15 DEGREES FAHRENHEIT UTILIZING SIMPLE LOW COST CONTROLS WILL REQUIRE SOME INNOVATIVE CONTROL TECHNOLOGY, COMPONENT MODIFICATION, AND TEST UNDER VARYING LOAD AND AMBIENT CONDITIONS. A TEST UNIT NOW OPERATES AT 20 DEGREES FAHRENHEIT. THE NEXT STEP WILL REQUIRE DIFFERENT CONTROLS AND REDESIGN OF THE UNIT COMPONENTS TO ACHIEVE THE LOWER TEMPERATURES. THE OBJECTIVE OF PHASE I IS TO BUILD TESTING FACILITIES, PROVIDE A SOPHISTICATED VARIABLE CONTROL AND MONITORING SYSTEM, DO A DETAILED EVALUATION OF THE COMPONENTS IN THE UNIT, AND DO A PRELIMINARY EVALUATION OF A NEW, LOW COST CONTROL SYSTEM.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.