SBIR/STTR Research Award

1.3 MICRON IN(ALGA)AS PHOTOVOLTAIC LASER ENERGY CONVERTERS

Award identifier 5a847766e0f5b5e4be1a33f14f360accfefe41c5a6001af9a2433bea13060ffaAwarding agency National Aeronautics and Space Administration

Award amount

$452,700

Program and phase

SBIR · Phase II

Award year

1992

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
Spire Corporation
Proposal award date
Not reported
Contract end date
Not reported
UEI
RG46KJGARZF4
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THIS PROJECT WILL INVESTIGATE UNIQUE LASER-ENERGY CONVERTERS(LECS) FOR 1.315 MICRON (0.943 EV) IODINE LASER, SPACE POWERSYSTEMS. THE GOAL IS TO CONVERT 40-50 PERCENT OF THE INCIDENT LASER POWER OF 500-1000 W/CM(2) TO ELECTRICAL POWER. TO ACHIEVE THE OPTIMUM 0.94 EV BANDGAP, METALORGANIC CHEMICAL VAPOR DEPOSITION (MOCVD) OF AN INNOVATIVE COMPOUND SEMICONDUCTOR, LN0.53(ALXGA1-X)0.47. AS, LATTICE-MATCHED TO INP SUBSTRATES, IS PLANNED. THE BANDGAP OF IN0.53GA0.47. AS (0.75 EV), LATTICE-MATCHED TO INP, IS SUBOPTIMAL; HOWEVER, BY ADDING AL TO THE INGAAS SO THAT THE ALXGA1-X FRACTION STAYS AT 0.47, THE LATTICE MATCH TO INP IS MAINTAINED AT THE SAME TIME AS THE EPILAYER BANDGAP INCREASES. INITIAL CALCULATIONS INDICATE IN0.53AL0.13GA0.34AS HAS THE OPTIMUM 0.94 EV BANDGAP. AN INNOVATIVE, PLANAR, SERIES-CONNECTED, MULTIJUNCTION LEC SHOULD LIMIT SERIES RESISTANCE EFFECTS. A PLANAR APPROACH AVOIDS SOME OF THE PROCESSING PROBLEMS INHERENT IN VERTICAL MULTIJUNCTION DESIGNS. IN PHASE I, IN0.53GA0.47. AS (CONTROL) AND IN0.53AL0.13GA0.34. AS PROTOTYPE LAYERS WILL BE GROWN ON INP SUBSTRATES WITH INP WINDOWS. THE BANDGAPS WILL BE CHECKED BY PHOTOLUMINESCENCE, THE LATTICE MATCH BY X-RAY DIFFRACTOMETRY, AND THE DOPING BY CV PROFILING. CELLS WILL BE FABRICATED TO CHECK THE PN JUNCTIONS AND TO MEASURE THE LOG IV, QUANTUM EFFICIENCY, AND POWER-CONVERSION EFFICIENCY. PLANAR, MULTIJUNCTION LEC WILL BE DESIGNED USING MEASURED DATA FROM THE ACTUAL MATERIAL, WITH PARTICULAR ATTENTION PAID TO ATTAINING A LOW SERIES RESISTANCE AND HIGH EFFICIENCY. IN PHASE II, FULL-SIZED, OPTIMIZED, PLANAR, SERIES-CONNECTED MULTIJUNCTION LECS BASED ON THE PHASE I WORK WOULD BE GROWN, FABRICATED, AND TESTED. THIS PROJECT WILL INVESTIGATE UNIQUE LASER-ENERGY CONVERTERS(LECS) FOR 1.315 MICRON (0.943 EV) IODINE LASER, SPACE POWERSYSTEMS. THE GOAL IS TO CONVERT 40-50 PERCENT OF THE INCIDENT LASER POWER OF 500-1000 W/CM(2) TO ELECTRICAL POWER. TO ACHIEVE THE OPTIMUM 0.94 EV BANDGAP, METALORGANIC CHEMICAL VAPOR DEPOSITION (MOCVD) OF AN INNOVATIVE COMPOUND SEMICONDUCTOR, LN0.53(ALXGA1-X)0.47. AS, LATTICE-MATCHED TO INP SUBSTRATES, IS PLANNED. THE BANDGAP OF IN0.53GA0.47. AS (0.75 EV), LATTICE-MATCHED TO INP, IS SUBOPTIMAL; HOWEVER, BY ADDING AL TO THE INGAAS SO THAT THE ALXGA1-X FRACTION STAYS AT 0.47, THE LATTICE MATCH TO INP IS MAINTAINED AT THE SAME TIME AS THE EPILAYER BANDGAP INCREASES. INITIAL CALCULATIONS INDICATE IN0.53AL0.13GA0.34AS HAS THE OPTIMUM 0.94 EV BANDGAP. AN INNOVATIVE, PLANAR, SERIES-CONNECTED, MULTIJUNCTION LEC SHOULD LIMIT SERIES RESISTANCE EFFECTS. A PLANAR APPROACH AVOIDS SOME OF THE PROCESSING PROBLEMS INHERENT IN VERTICAL MULTIJUNCTION DESIGNS. IN PHASE I, IN0.53GA0.47. AS (CONTROL) AND IN0.53AL0.13GA0.34. AS PROTOTYPE LAYERS WILL BE GROWN ON INP SUBSTRATES WITH INP WINDOWS. THE BANDGAPS WILL BE CHECKED BY PHOTOLUMINESCENCE, THE LATTICE MATCH BY X-RAY DIFFRACTOMETRY, AND THE DOPING BY CV PROFILING. CELLS WILL BE FABRICATED TO CHECK THE PN JUNCTIONS AND TO MEASURE THE LOG IV, QUANTUM EFFICIENCY, AND POWER-CONVERSION EFFICIENCY. PLANAR, MULTIJUNCTION LEC WILL BE DESIGNED USING MEASURED DATA FROM THE ACTUAL MATERIAL, WITH PARTICULAR ATTENTION PAID TO ATTAINING A LOW SERIES RESISTANCE AND HIGH EFFICIENCY. IN PHASE II, FULL-SIZED, OPTIMIZED, PLANAR, SERIES-CONNECTED MULTIJUNCTION LECS BASED ON THE PHASE I WORK WOULD BE GROWN, FABRICATED, AND TESTED.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

429 SBIR/STTR records share this UEI (1983–2014). Reported award amounts total $73,907,551. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation, Department of Energy, Department of Health and Human Services, Department of Commerce

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.