SBIR/STTR Research Award

Innovative Modular, Multiple Power Levels, 325 MHz Spokes Cavities Power Couplers

Award identifier d1e4ba53719354c58c26b9c1fe89d2712f92c2c9f2744ec7a097ef0bbe084d3cAwarding agency Department of Energy

Award amount

$625,000

Program and phase

SBIR · Phase II

Award year

2006

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Amac International, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
DE-FG02-06ER06-09
Topic code
37

Research abstract

In order to increase proton energy up to 8 GeV in a driver linear accelerator, particles must be accelerated through various stages and three different power levels (25kW, 100 kW, and 210kw). Unfortunately, no power coupler element for these cavities has ever been produced using U.S. industrial capabilities. This project will develop innovative modular, multiple power level, 325 MHz spoke cavities power couplers. Phase I optimized and defined parameters for the 325 Mhz RF power couplers. Multipacting calculations were made to determine the RF parameters and to investigate the thermal characteristics of the coupler designs. Phase II will involve further optimization and finalization of the RF and thermal characteristics; detailed engineering drawings with emphasis on the use of cost saving features and approaches; fabrication of a prototype coupler for operation at 25-210 kW peak power, in order to meet all specifications of the proposed Proton Driver Linac at Fermi National Laboratory (FNL); and high power testing of the coupler(s) at FNL to verify performance. Commercial Applications and other Benefits as described by the awardee: The modular component design should significantly reduce the fabrication costs for the 110 power couplers required for the Fermilab Proton Driver, by reducing the parts fabrication costs and the number of brazing fixtures needed. The modular universal design could be the model for any future cost saving applications, where several coupler power levels are required for many DOE accelerator projects and industrial applications.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.