SBIR/STTR Research Award

FEEDTHROUGH FOR FUSION LAUNCHER SYSTEMS

Award identifier f8e02cb12bb830551b64d48f7a435632d02e6078cebfe291c5b9eaa109a58aeaAwarding agency Department of Energy

Award amount

$50,000

Program and phase

SBIR · Phase I

Award year

1984

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
MICROWAVE TECHNOLGIES, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

PRESENT ICRF EXPERIMENTS, NEAR TERM PLANNED EXPERIMENTS SUCH AS TFTR AND DOUBLET III, AND FUTURE DEVELOPMENT OF THE ENGINEERING TEST REACTOR (ETR) AND THE FUSION DEMONSTRATION PLANT (FDP) ALL EITHER EXHIBIT OR FORESEE VOLTAGE BREAKDOWN PROBLEMS, POWER HANDLING LIMITATIONS AND ENVIRONMENTAL RESTRICTIONS FOR THE COAXIAL VACUUM FEEDTHROUGHS. MICROWAVE TECHNIQUES SHALL INVESTIGATE VIA BREAD-BOARD AND PROTOTYPE-FOR-TEST MODELS THE VIABILITY OF A NONLINEAR MATHEMATICALLY DEFINABLE BDC TAPER DESIGN OF THE CERAMIC WINDOW ELEMENT TO COUNTERACT BREAKDOWN DUE TO THE MIS-MATCHES FROM THE PLASMA HEATING BY ICRF. THE PROTOTYPES WILL BE MODELED IN 3-1/8" COAXIAL LINE, PROVIDING FEASIBILITY OF PERFORMANCE CHARACTERISTICS WHICH CAN BE USED FOR SCALING TO 9-3/16" OR LARGER SIZES FOR PHASE II DEVELOPMENT AND TEST AT HIGHER POWER LEVELS. A TRAVELING WAVE RESONATOR (TWR) WOULD BE BUILT IN PHASE II FOR TESTING REACTIONS OF THE COMPONENT TO SIMULATED CONDITIONS OF 10 MW AVERAGE POWER (NEAR-SIMULTANEOUS INTRODUCTION OF VOLTAGE AND CURRENT). CONTROLLED COOLING AND VACUUM INTEGRITY WILL BE ADVANCED BY OUR DESIGN TO THOSE METHODS NOW GENERALLY EMPLOYED. PROJECTED AFFECTS OF THE STRONG MAGNETIC FIELDS AND THE RADIATION ENVIRONMENT ON BOTH MATERIALS AND THE RF FIELD WILL BE ANALYZED FOR APPLICABLE DESIGN CRITERIA DURING PHASE II. PROJECTED RESULTS ARE A REALIZATION OF THE FEASIBILITY FOR A VACUUM FEEDTHROUGH DESIGN FOR 30 TO 100 MHZ, OPERATING TO 10 MW AVERAGE POWER, DELIVERING 3 KW/CM(2) OF POWER INTO A 10:1 MISMATCH CONDITION.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.