SBIR/STTR Research Award

AN ARGON-FROST CONTINUOUS CRYOPUMP FOR FUSION APPLICATIONS

Award identifier bb56fba670e248c701504e388c080c0043b7991cd5d0c1c753ccaceda5dfd556Awarding agency Department of Energy

Award amount

$498,900

Program and phase

SBIR · Phase II

Award year

1992

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Cryogenic Applications F, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

FUSION REACTORS BASED ON THE MAGNETIC CONFINEMENT OF PLASMASWILL REQUIRE HIGH SPEED PUMPING OF HELIUM, DEUTERIUM, AND TRITIUM AT HIGH THROUGHPUT WHILE LIMITING THE INVENTORY OF TRITIUM IN THE PUMPS TO A LOW LEVEL. MINIMIZING THE TRITIUMINVENTORY OF A FUSION REACTOR IS VERY DESIRABLE BECAUSE IT IMPROVES THE PASSIVE SAFETY OF THE REACTOR. A COMPOUND CRYOPUMP WAS SELECTED BY THE INTERNAL THERMONUCLEAR EXPERIMENTAL REACTOR (ITER) DESIGN TEAM FOR THE CONCEPTUAL DESIGN OF THE ITER VACUUM PUMPING SYSTEM. UNFORTUNATELY, INEXISTING DESIGNS, THE CRYOPUMP MUST BE REGENERATED FREQUENTLY TO LIMIT THE INVENTORY OF TRITIUM IN THE PUMP. THIS FREQUENT REGENERATION REQUIRES RAPID CYCLING OF MANY LARGE VACUUM AND CRYOGENIC VALVES AND OTHER COMPONENTS, COMPROMISING THE RELIABILITY OF THE SYSTEM AND POSSIBLY LEADING TO A HIGHER TRITIUM INVENTORY THAN DESIRABLE. A CONTINUOUS COMPOUND CRYOPUMP IS BEING DEVELOPED THAT MEETS THE ITER PERFORMANCE REQUIREMENTS WITHOUT CYCLING THE PUMP, WHILE REDUCING THE TRITIUM INVENTORY IN THE PUMPING SYSTEM FROM 400 GRAMS TO LESS THAN 100 GRAMS. THIS COMPOUND CRYOPUMP REQUIRES AN EXTENSION OF THE CRYOPUMP TECHNOLOGY BEING DEVELOPED FOR VARIOUS APPLICATIONS; THE NOVEL UNTESTEDFEATURE IS A CONTINUOUS ARGON-FROST CRYOSORPTION PUMP. THE PHASE I EFFORT SHOULD DEMONSTRATE THE FEASIBILITY OF THIS FEATURE AND PRODUCE A CONCEPTUAL DESIGN FOR A PROTOTYPE PUMP FOR THE ITER. THE PHASE II EFFORT WILL UNDERTAKE TO DESIGN AND CONSTRUCT A PROTOTYPE ITER PUMP SUITABLE FOR TESTING AT A DOE TRITIUM FACILITY.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.